In this paper, a two-stage procedure is proposed in order to solve the centralized self-healing scheme for electrical distribution systems. The considered self-healing actions are the reconfiguration of the distribution grid and, if needed, node and zone load-shedding. Thus, the proposed procedure determines the status of the switching devices in order to effectively isolate a faulty zone and minimize the number of de-energized nodes and zones, while ensuring that the operative and electrical constraints of the system are not violated. The proposed method is comprised of two stages. The first stage solves a mixed integer linear programming (MILP) problem in order to obtain the binary decision variables for the self-healing scheme (i.e., the switching device status and energized zones). In the second stage, a nonlinear programming (NLP) problem is solved in order to adjust the steady-state operating point of the topology found in the first stage (i.e., correction of the continuous electrical variables and load-shedding optimization). Commercial optimization solvers are used in the first stage to solve the MILP problem and in the second stage to solve the NLP problem. A 44-node test system and a real Brazilian distribution system with 964-nodes were used to test and verify the proposed methodology.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations鈥揷itations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.