Multi-equipment multi-process frequent scheduling under complex constraints is at the root of a large number of idle time fragments and transport waiting time in multi-equipment processes. To improve equipment utilization and reduce idle transportation time, a production process optimization scheduling algorithm with “minimum processing time and minimum transportation time” is proposed. Taking into account factors such as product priority, equipment priority, process priority, and overall task adjustment, the scheduling optimization is carried out through a hybrid algorithm combining a one-dimensional search algorithm and a dual NSGA-II algorithm. Compared with other algorithms, the scheduling algorithm proposed in this article not only shortens the minimum processing time but also strives to maximize the utilization rate of each piece of equipment, reducing the processing time of the enterprise by 8% or more, while also reducing the overall transportation time and indirectly reducing costs. The superiority of this algorithm is verified through practice, showing that that the complexity of the scheduling process is lower, and it is feasible in actual operation
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.