The rich water tunnel often uses “water blocking and drainage limiting” waterproofing and drainage systems. On the one hand, the drainage system is set behind the lining to reduce the water pressure. On the other hand, the stratum grouting is used to control the discharge flow of groundwater. In the drainage system, it is important to determine the distance between the annular blind pipes, but there is no clear calculation formula, which leads to the designer often relying on experience. First, the groundwater drainage system is constructed. Based on Darcy’s law and the law of conservation of mass, the formula for calculating the seepage discharge and the seepage pressure with the parameters of annular blind pipe spacing is derived. At the same time, the design parameters of the grouting circle are optimised, and then the formula of annular blind pipe spacing is derived according to the design value of the antiwater pressure of the secondary lining structure and the allowable seepage discharge of the tunnel. Finally, based on the case study of the Hongtu extra-long tunnel under construction, it is verified by field monitoring data. The results show that (1) grouting reinforcement is an important means to reduce water seepage, and tunnel water seepage can be adjusted by changing the thickness and permeability coefficient of the grouting reinforcement circle, in which the thickness of the reinforcement circle should not be too large, and the permeability coefficient should not be less than 1/80 of the surrounding rock permeability coefficient; (2) according to the derived formula, the water pressure of the secondary lining structure decreases in a parabolic manner from the middle of the two rows of annular blind pipes to the place where the annular blind pipes are set; (3) the allowable water seepage of the tunnel and the design value of the water pressure resistance of the lining structure should be considered when determining the distance between annular blind pipes; and (4) based on the derived formula, the distance between the annular blind pipes in the test section of the Hongtu extra-long tunnel is determined to be 8 m.
Affected by the coupling of excavation disturbance and ground stress, the heterogeneity of surrounding rock is very common. Presently, treating the permeability coefficient as a fixed value will reduce the prediction accuracy of the water inflow and the external water pressure of the structure, leading to distortion of the prediction results. Aiming at this problem, this paper calculates and analyzes tunnel water inflow when considering the heterogeneity of permeability coefficient of surrounding rock using a theoretical analysis method, and compares with field data, and verifies the rationality of the formula. The research shows that, when the influence of excavation disturbance and ground stress on the permeability coefficient of surrounding rock is ignored, the calculated value of the external water force of the tunnel structure is too small, and the durability and stability of the tunnel are reduced, which is detrimental to the safety of the structure. Considering the heterogeneity of surrounding rock, the calculation error of water inflow can be reduced from 27.3% to 13.2%, which improves the accuracy of water inflow prediction to a certain extent.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.