In recent years, M oilfield has entered into high water cut stage. Two main problems are imposed in the process of development including sharp water cut rising rate and rapid oil production decline. These problems are difficult to solve, which may bring other problems. In order to slow down production decline rate and control the rising rate of water cut, it is necessary to control water injection rate. However, oil production rate can be affected if water injection rate is too low to provide enough water volume for maintaining reservoir pressure. A method to calculate reasonable injection-production ratio and predict water cut is provided in this paper. Its main mechanism is to resolve above contradictions by calculating reasonable water injection rate. Firstly, an equation to calculate reasonable injection-production ratio is deduced by material balance equation. It considers several parameters including rate of pressure recovery, water cut and other production indexes. Secondly, reasonable oil production rates and water cut of future 10 years are predicted. Oil production is predicted by the law of production decline, and water cut is predicted by regression equation of water drive characteristic curve. Lastly, reasonable water injection rates of next 10 years are calculated through predicted injection-production ratios and liquid production rates. Taking M oilfield as an example, this paper presents a method to determine reasonable water injection rate of multilayer sandstone water drive reservoir.Keywords Reasonable water injection rate Á Reasonable reservoir pressure Á Material balance equation Á Anticline multilayer sandstone water drive reservoir
As the basic condition for ensuring the stability of oil extraction in the development process of oil extraction in our country, some areas have entered the stage of high water cut development. It is very difficult to develop water drive reservoirs in the high water cut development stage, especially under the background of low oil price industry. How to ensure the orderly promotion of the beneficial development of water drive reservoirs and optimize the comprehensive quality of development has become the core of the development process of the industry and enterprises. The core of this is how to use fine injection and production technology. Therefore, the oil production plant needs to integrate different types of water drive reservoir requirements, take it as the core orientation, start based on the water quality source, place the target on good water injection and effective water injection, optimize and innovate fine injection and production technology in an all-round way, so as to achieve the high efficiency of the entire regulation process, improve the quality of water drive, and achieve the development goal of water drive reservoir benefits. Based on this, this paper analyzes this problem, and puts forward some suggestions on the application of technology for reference.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.