GWA13 was the last well during Phase 1 of the development of the Goodwyn field and was drilled to a total depth of 8420m (27620') AHD with a horizontal step out of 7372m (24190') at a TVD of 2866m (9400').
The paper describes the planning processes before spud, and the equipment, techniques and directional control used during the drilling phase. Lessons that can be applied to both our own and other operations will be listed. The team approach to the drilling of Goodwyn wells will be emphasised and the risk assessment measures used both in the office and on the rig will be detailed.
P. 271
GWA13 was the last well during Phase 1 of the development of the Goodwyn field and was drilled to a total depth of 8420m (27620') AHD with a horizontal step out of 7372m (24190') at a TVD of 2866m (9400'). The paper describes the planning processes before spud, and the equipment, techniques and directional control used during the drilling phase. Lessons that can be applied to both our own and other operations will be listed. The team approach to the drilling of Goodwyn wells will be emphasised and the risk assessment measures used both in the office and on the rig will be detailed.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.