Production performance of Esso Resources Canada Limited’s Horizontal Well Pilot I (HWPI), recovering10 degree API bitumen from Cold Lake, is described. The well has utilized a vertical steam injection well since 1980. Over 50,000 m3 of bitumen have been recovered at a cumulative oil-steam ratio (OSR) of over 0.35 during the first eight years of operation. A comprehensive field monitoring program of HWPI was undertaken including well bottomhole pressures and temperatures, reservoir temperatures, interwell radioactive tracer tests, surface seismic surveys and cased hole logs. Approximately 20 to 30 percent of the original bitumen in place in a thermally drained zone, inferred from measured surface seismic data, was recovered. A wellbore utilization of approximately 98 meters or 40 percent of the total horizontal slotted liner length was estimated based on the surface seismic anomalies and bitumen production data. This finding was confirmed from the results of a successful numerical simulation history match of this pilot. Analytical models have identified that pressure drive mechanisms dominated the early life of the well, with gravity drainage accounting for most of the production later in the well’s life.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.