Well X is a development well which is directionally drilled. Directional drilling is choosen because the coordinate target of Well X is above the buffer zone. The directional track plan needs accurate survey calculation in order to make the righ track for directional drilling. There are many survey calculation in directional drilling such as tangential, underbalance, average angle, radius of curvature, and mercury method. Minimum curvature method is used in this directional track plan calculation. This method is used because it gives less error than other method. Kick-Off Point (KOP) and End of Buildup (EOB) analysis is done at 200 ft, 400 ft, and 600 ft depth to determine the trajectory design and optimal inclination. The hole problem is also determined in this trajectory track design. Optimal trajectory design determined at 200 ft depth because the inclination below 35º and also already reach the target quite well at 1632.28 ft TVD and 408.16 AHD. The optimal inclination at 200 ft KOP depth because the maximum inclination is 18.87º which is below 35º. Hole problem will occur if the trajectory designed at 600 ft. The problems are stuck pipe and the casing or tubing will not able to bend.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.