Please cite this article as: Javid Ghahremani-Nahr, Ramez Kian, Ehsan Sabet, A robust fuzzy mathematical programming model for the closed-loop supply chain network design and a whale optimization solution algorithm,
a b s t r a c tIn this work the uncapacitated dynamic lot-sizing problem is considered. Demands are deterministic and production costs consist of convex costs that arise from economic production functions plus set-up costs. We formulate the problem as a mixed integer, non-linear programming problem and obtain structural results which are used to construct a forward dynamic-programming algorithm that obtains the optimal solution in polynomial time. For positive setup costs, the generic approaches are found to be prohibitively time-consuming; therefore we focus on approximate solution methods. The forward DP algorithm is modified via the conjunctive use of three rules for solution generation. Additionally, we propose six heuristics. Two of these are single-stepSilver-Meal and EOQ heuristics for the classical lot-sizing problem. The third is a variant of the Wagner-Whitin algorithm. The remaining three heuristics are two-step hybrids that improve on the initial solutions of the first three by exploiting the structural properties of optimal production subplans. The proposed algorithms are evaluated by an extensive numerical study. The two-step Wagner-Whitin algorithm turns out to be the best heuristic.
Condition-based monitoring is used as part of predictive maintenance to collect real-time information on the healthy status of a vessel engine, which allows for a more accurate estimation of the remaining life of an engine or its parts, as well as providing a warning for a potential failure of an engine part. An engine failure results in delays and down-times in the voyage of a vessel, which translates into additional cost and penalties. This paper studies a spare part management problem for maintenance scheduling of a vessel operating on a given route that is defined by a sequence of port visits. When a warning on part failure is received, the problem decides when and to which port each part should be ordered, where the latter is also the location at which the maintenance operation would be performed. The paper describes a mathematical programming model of the problem, as well as a shortest path dynamic programming formulation for a single part which solves the problem in polynomial time complexity. Simulation results are presented in which the models are tested under different scenarios.
In a closed-loop supply chain network, the aim is to ensure a smooth flow of materials and attaining the maximum value from returning and end-of-life goods. This paper presents a single-objective deterministic mixed integer linear programming (MILP) model for the closed-loop supply chain (CLSC) network design problem consisting of plants, collection centers, disposal centers, and customer zones. Our model minimizes the total costs comprising fixed opening cost of plants, collection, disposal centers, and transportation costs of products among the nodes. As supply chain network design problems belong to the class of NP-hard problems, a novel league championship algorithm (LCA) with a modified priority-based encoding is applied to find a near-optimal solution. New operators are defined for the LCA to search the discrete space. Numerical comparison of our proposed encoding with the existing approaches in the literature is indicative of the high quality performance of the proposed encoding.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.