Despite the envisaged benefits of BIM adoption for SMEs, BIM in SMEs has remained an underrepresented area within the available academic literature. This study proposes and draws upon a framework grounded on innovation diffusion theory (IDT) to provide an illuminating insight into the current state of BIM and the main barriers to BIM adoption within Australian SMEs. Based on analyses of 135 questionnaires completed by SMEs through partial least squares structural equation modelling (PLS-SEM) and grounded on the proposed framework, the current state of BIM adoption and barriers to BIM adoption for SMEs are discussed. The findings show that currently around 42% of Australian SMEs use BIM in Level 1 and Level 2 with only around 5% have tried Level 3. It comes to light that lack of knowledge within SMEs and across the construction supply chain is not a major barrier for Australian SMEs. In essence, the main barriers stem from the risks associated with an uncertain return on investment (ROI) for BIM as perceived by key players in SMEs. The findings also show the validity of the framework proposed for explaining BIM adoption in Australian SMEs.
Reverse logistics in construction refers to the movement of products and materials from salvaged buildings to a new construction site. While there is a plethora of studies looking at various aspects of the reverse logistics chain, there is no systematic review of literature on this important subject as applied to the construction industry. Therefore, the objective of this study is to integrate the fragmented body of knowledge on reverse logistics in construction, with the aim of promoting the concept among industry stakeholders and the wider construction community. Through a qualitative meta-analysis, the study synthesises the findings of previous studies and presents some actions needed by industry stakeholders to promote this concept within the real-life context. First, the trend of research and terminology related with reverse logistics is introduced. Second, it unearths the main advantages and barriers of reverse logistics in construction while providing some suggestions to harness the advantages and mitigate these barriers. Finally, it provides a future research direction based on the review.
Purpose – This paper aims to present a survey of the perceptions of the barriers to implementing reverse logistics (RL) practices in South Australian (SA) construction organisations. Despite the extensive research on forward logistics and RL, there is a paucity of studies that examine the barriers to implementing RL particularly within the Australian construction industry. This study builds on the ongoing research being undertaken by the authors, entitled “Designing for reverse logistics (DfRL) within the building life cycle: practices, drivers and barriers”, which is examining the best practices and drivers that could be used as a “road map” for developing appropriate solutions for the successful implementation of RL. Design/methodology/approach – Data were collected by utilising a triangulated data collection approach, a literature review and 49 questionnaires. The review of the literature identified 16 barriers to implementing RL. The quantitative survey data were subjected to descriptive and inferential statistics with correlation analysis to examine the relationships between different pairs of variables comprising RL’s critical barriers. Findings – The following barriers were indicated as most significant: lack of incorporation of salvaged materials by designers; regulation restrictions to usage of recovered materials and components; potential legal liabilities; higher costs; and longer-time association with deconstructing buildings. The least ranked barriers were mostly drawn from the operational and industrial categories as being: organisational lack of support for deconstruction due to incompatible design; lack of organisational support for deconstructing buildings due to higher health and safety risks; and inadequate skills and experience for deconstruction (operational). The industrial barrier was related to “higher costs of salvaged materials in comparison to virgin products”. Research limitations/implications – First, the reported findings are focussed on one study that used questionnaire surveys within the construction industry; therefore, the results may not be generalisable to other contexts. Further, studies should be conducted and extended to other industrial sectors beyond the construction industry. Second, the quantitative study (n = 49) used a smaller sample, and the survey items were based on the review of the literature. Practical implications – The identified barriers could be used as a “road map” for the development of appropriate solutions for the successful implementation of RL, and to improve the environment-related decision-making processes of contractors. Originality/value – This study makes a contribution to the body of knowledge on the subject of RL within a previously unexplored SA context. In addition, the study provides some insights on the contributory effects of the barriers to the implementation of RL. It is the first work undertaken to determine the barriers to the adoption of RL within the SA construction industry.
Purpose A significant amount of work has been performed in the area of identification of factors affecting construction productivity. Previous studies have tried to determine the most important factors affecting construction productivity in different countries for a long time. As a result of continuous effort in this direction, researchers have identified a wide range of factors. While the subject area has matured, no general agreement could be made on the factors affecting construction productivity. To fill this gap, the purpose of this paper is to undertake a comprehensive systematic review of mainstream studies on factors affecting construction productivity published in the last 30 years (1986–2016). Design/methodology/approach A total of 46 articles from different sources such as journals, conference proceedings, dissertation and PhD theses were identified and thoroughly reviewed. Findings Gaps in research and practices are discussed and directions for future research have been proposed. The literature review indicates that despite noticeable differences in the socio-economic conditions across both developed countries and developing countries, an overall reasonable consensus exists on few significant factors impeding productivity. These are, namely, non-availability of materials, inadequate supervision, skill shortage, lack of proper tools and equipment and incomplete drawing and specifications. Nevertheless, implications of technology, site amenities, process studies, project culture, and impacts of physiological and psychological factors were not adequately covered in existing literature. The study also found that traditional construction projects have remained the main focus of these studies while green construction projects have been generally overlooked. Research limitations/implications The review does not include studies that report productivity at the organisational or industry level as well as total factor productivity. The scope of the review is limited to work on identification of factors affecting productivity at the activity level in construction projects. Practical implications The outcomes of this study would help researchers and practitioners by providing the findings of previous studies in a concise manner. It is also expected that presenting a deeper and wider perspective of the research work performed until now will direct a more focussed approach on productivity improvement efforts in the construction industry. Originality/value This review paper undertakes a comprehensive systematic review of studies on identification of factors affecting construction productivity published during the last three decades.
Purpose -The construction industry consumes large amounts of natural resources, which are not properly utilised owing to the generation of waste. Construction waste has challenged the performance of the industry and its sustainable goals. The majority of the causes underlying material waste are directly or indirectly affected by the behaviour of the construction workforce. Waste occurs on site for a number of reasons, most of which can be prevented, particularly by changing the attitudes of the construction workforce. Therefore, the attitudes and perceptions of the construction workforce can influence the generation and implementation of waste management strategies. The research reported in this paper is based on a study aimed at evaluating the attitudes and perceptions of the construction workforce involved during the pre-and post-contract stages towards minimising waste. Design/methodology/approach -A structured questionnaire survey was carried out to understand and evaluate the attitudes and perceptions of the workforce. Four types of questionnaires were prepared for project managers/site managers, supervisors, labourers, and estimators. Findings -The findings indicate the positive perceptions and attitudes of the construction workforce towards minimising waste and conserving natural resources. However, a lack of effort in practising these positive attitudes and perceptions towards waste minimisation is identified. The paper further concludes that negative attitudes towards subordinates, attitudinal differences between different working groups, and a lack of training to reinforce the importance of waste minimisation practices have obstructed proper waste management practices in the industry. Originality/value -The paper reveals the effect of the attitudes and perceptions of the construction workforce towards waste management applications, which would be of benefit to construction managers in designing and implementing better waste management practices.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.