The study of slope stability along the proposed Lerabire road in the Mergasur town, in Erbil city, Kurdistan region of NE-Iraq is carried out. To evaluate the stability of slopes, twenty stations were selected along the mentioned road, two stations in the rock slopes of the Shiranish Formation, eleven stations in the Bekhme Formation, six stations in the Qamchuqa Formation, and one station in the Sarmord Formation. In this study, the stability of rock slopes has been evaluated by the Landslide Possibility Index system. The results of the Landslide Possibility Index category in the rock slopes along the proposed Lerabire road ranges from a very low to low for rock slopes in stations 1 and 2 (marl and marly limestone of the Shiranish Formation, Moderate for rock slopes in stations 3, 4 and 19 (limestone of the Bekhme Formation), High for rock slopes in the stations 5, 6, 7, 8, 9, 10, 11 (limestone of the Bekhme Formation), stations 12, 17 (limestone and marly limestone of the Qamchuqa Formation), station 20 (limestone of the Sarmord Formation and very high for rock slopes in the stations 13, 14, 15, 16 (limestone and marly limestone of the Qamchuqa Formation), station 18 (limestone of the Bekhme Formation). According to Landslide Possibility Index category, the hazard category is Low in station 1 in the Shiranish Formation, but in station 2, 3, 4 and 19 are Moderate, moreover, in the station 5, 11, 12, 17, 18 and 20 are high. The rock slope assessment indicated that the height of the slope face, slope angle, a high degree of weathering, and discontinuities spacing are the factors that increase the failure possibility. To prevent landslide the ditch method is used in the Shiranish Formation rock slopes, the reinforcement techniques are used in the Behkme Formation rock slopes and rock removal methods are used in Qamchuqa and Sarmord Formation rock slopes.
The rock slope instability along the Khalifan-Bekhal-Rawanduz main road has been studied in the southwestern limb of the Bradost anticline (Mountain) and both northeastern and southwestern limb of the Korek anticline (Mountain) in the northeast of the Erbil city, Kurdistan Region, Iraq. The major factors of the instability of the rock slopes in the study area are types of discontinuous and the degree of erosion. Ten stations have been chosen for fieldwork. The expected failure types that may occur along the road are plane sliding and wedge sliding. This research is mainly focused on the type of failure along the rock slope and the factor that affect the instability of the studied slopes and have found that they are slope orientation and geometry of the discontinuity. Different remediation methods are proposed for the studied rock slopes base on rock slope analysis. The rock slopes along the road require continuous monitoring because of their hazard conditions.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.