Cost estimation on the bidding phase is a crucial stage that determines the success of the Engineering, Procurement and Construction (EPC) project. If the cost offered to the client is too high then it could not compete with the other bidder, but if the cost offered are too low it can reduce profit margins and result in losses for the EPC companies. This paper describe the use of Back Propagation Neural Network method to help determine cost estimation. This method is applied specifically to determine control valve cost estimation on the bidding phase so that the retrieved costs will be accurate. When there is no technical and price quotation from vendors as well as the narrowness of the bidding processing time, this method can be an alternative choice to determine the price based on previous vendor quotation. In the future, this method could be developed and applied for other instrumentation equipment such as transmitter, switch, analyzer, control system and others to achieve total cost estimation of instrumentation equipment in EPC bidding proposal.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.