PurposeLongwall mining is a special mining method with high productivity and smooth operation and the drum shearer is known as the most important component in longwall mines due to its direct role in the coal cutting and production process. Therefore, its reliability is important in keeping the mine production at a desired level. Hence, reliability analysis is essential in identifying and removing existing problems of this machine in order to achieve a better production condition. This paper seeks to learn about the reliability of the shearer machine in order to locate critical subsystems. The improvement of the reliability of the critical subsystems, to enhance the optimum operation of the shearer machine, is the main objective of this research.Design/methodology/approachA basic methodology was used in this paper for the reliability modeling of the shearer machine. First, failure and performance data from a two‐year period at the Tabas Coal Mine‐Iran was classified and sorted. The tests for validating the assumption of independent and identical distribution (iid) of TBF data are done and the best modeling method for each subsystem was selected among the renewal process, homogeneous Poisson process and non‐homogeneous Poisson process. Finally, the reliability of subsystems and the machine were assessed.FindingsThe study revealed that six important subsystems of the shearer machine are; water system, haulage, electrical system, hydraulic system, cutting arms, and cable system. Pareto analysis shows that the 30 percent of failures and stoppages of the shearer were related to the water system and this system is the most critical subsystem of the machine. The failure rate analysis shows that the failure rates of the hydraulic, haulage and electrical systems were decreasing, meanwhile, the failure rates of the water system, cutting arms and cable system were increasing. The reliability of drum shearer reaches the zero value after 100 hours.Originality/valueThis paper, for the first time, defines a practical set of subsystems for the coal shearer based on field data and machine design.
Spare-part management has a significant effect on the productivity of mining equipment. The required number of spare parts can be estimated using failure and repair data collected under the name of reliability data. In the mining industry, failure and repair times are decided by the operational environment, rock properties, and the technical and functional behavior of the system. These conditions are heterogeneous and may change significantly from time to time. Such heterogeneity can change equipment’s reliability performance and, consequently, the required number of spare parts. Hence, it is necessary for effective spare-part planning to check the heterogeneity among the reliability data. After that, if needed, such heterogeneity should be modeled using an adequate statistical model. Heterogeneity can be categorized into observed and unobserved caused by risk factors. Most spare-part estimation studies ignore the effect of heterogeneity, which can lead to unrealistic estimations. In this study, we introduce the application of a frailty model for modeling the effect of observed and unobserved risk factors on the required number of spare parts for mining equipment. Studies indicate that ignoring the effect of unobservable risk factors can cause a significant bias in estimation.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.