In order to curb the negative impact of changes on a project, it is crucial to implement change management. This study investigated the current practice of managing change order in the Nigerian Construction Industry. A wide-ranging literature review and questionnaire survey was conducted to gain in-depth understanding of change management. Stratified random sampling was used to sample 240 respondents (including architects, quantity surveyors, building engineers and building service engineers. The Statistical Package for the Social Sciences (SPSS) version 22 was used for data analysis. The analysis results established that change management application is at 15 % in Nigeria which is relatively low. Contentment with outdated methods of construction and high application cost, as well as lack of knowledge was the major drawbacks to change management. Respondent perceived benefit included faster response to change order; reduce time and human resource use. Completion schedule delay; bureaucracy-based client management, and poor coordination and documentation were the three major problems associated with construction industry practice presently. The paper concludes that based on perceived benefits attributed to change
A change is an amendment or addition with respect to the original plans, specification or other contract documents and vital factor in construction project management. A change order is an instruction from an employer approving a change. Construction projects in Nigeria have suffered deleteriously as a consequence of extensive change orders, which has manifested in cost and time overruns, disputes, arbitration, litigation and even the abandonment of projects and this negatively impacts on the efficiency of the Nigerian construction industry.This paper explore the extent change order management strategies correlate with overall building project in Nigeria. Thirty strategies for managing change order were identified through intensive literature search. Twenty -one factors peculiar to the Nigerian construction industry were used to develop a questionnaire. A total of 323 questionnaires were administered through stratified random sampling to respondents in the cities of Abuja, Kano and Bauchi. The study targeted construction Consultants namely Architects, Quantity Surveyors Building Engineers, Service Engineer (Electrical & Mechanical), Contractor and Building owners in three sub-study cities. The study recorded an overall response rate of 80.8 %. Using SPSS version 22, the questionnaire was subjected to reliability test. Statistical analysis was used using average index; spearman correlation coefficient; factor analysis and multiple regression were used to analysis data from survey questionnaire. The study reveal that change orders are better manage at the design stage and that clear and thorough project brief, better initial planning and thorough detailing of design are the three topmost management strategies. The study established that overall project success is impacted by change order management with a R 2 of 0.252, meaning that change order management at the design stage accounts for 25.2% of the variation in building project outcomes. The Spearman's (rho) also show strong agreement among respondents. The study concluded that proper adoption and use of project implementation phase principles by project sponsor, increased effort at the design stage of projects by project participant and allocation of adequate resources to project requirement will help minimize change orders in project delivery in Northern Nigeria
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.