A seven well Big-Bore Underbalanced drilling and completion program was undertaken under challenging downhole conditions in a low pressure, high permeability carbonate reef reservoir in Indonesia. Underbalanced drilling technology was utilised as conventional drilling practices were no longer viable due to the extreme low pressure (1.1ppg e). UBD was selected as it would eliminate lost circulation and stuck pipe problems, reduce formation damage, eliminate the need for post drilling stimulation and give early analysis of reservoir behaviour and production rates. The resulting wells incorporated the largest tubingless gas completions in the world and were completed in an undamaged state, resulting in 29% higher than anticipated initial gas production rates. This paper will describe the Front End Engineering Design, Project Management, Risk Mitigation, Detailed Engineering & Design, Operational Results and Lessons Learned for this project. Introduction Located in a remote part of Indonesia, the field to be discussed was approximately twenty six years old at the time of the project, and the reservoir pressure had been falling rapidly from the original BHP of 7,100psis to a BHP of +/− 600psia at the time of the project. Conventional drilling techniques have proved unsuccessful for drilling new wells into the reservoir (the last attempt was in 1995) because the formation was unable to support the column of drilling fluid, leading to lost circulation and stuck pipe. In 1998, six wells were drilled underbalanced after an extensive pilot test, which utilised custom built equipment1. The ensuing studies and analysis pointed to an underbalanced Coiled Tubing Drilling (CTD) campaign. However, subsequent wellbore design, production demand and economics led to the conclusion that Big Bore (large diameter wellbore) wells drilled underbalanced with jointed pipe would be the most economical solution. This case study will provide details of how the project was progressed from the initial concept to use CTD up to the successful implementation of a seven well UBD program: A detailed Basis of Design (BOD) was developed to review the key drilling issues and make recommendations for how to best proceed with the project. Tender documents were issued, basic design was undertaken and contracts were signed. The detailed engineering & design phase was then conducted to refine the initial concept. This phase also included Quality, Health, Safety and Environment (QHSE). Seven wells were successfully drilled; the results of these operations and the lessons learned will be discussed later. Key Project Drivers The key project drivers were:Rapidly depleting high permeability and vugular limestone reservoir with ultra low reservoir pressure - static reservoir pressures on Cluster III ranged from 570 to 585 psia and in Cluster IV from 650 to 700psia. The reservoir pressure (1.1–1.4ppg e) was depleting rapidly at 0.3–0.4 psi/day (Figure 1). The speed of implementation was critical because with the rapid pressure depletion of the field it would soon not be possible to drill these wells underbalanced.Conventional drilling was no longer viable or economic due to massive losses with a mud system, mechanical and differential sticking, low ROP and formation damage (high skin) caused by overbalanced (conventional) drilling, which in turn reduces production rates. Drilling underbalanced would minimise/eliminate all the above conventional drilling problems and reservoir concerns.Reduce/eliminate the need for post drilling well stimulation.Provide early analysis of reservoir behaviour and production rates.
This paper describes the use of an under balanced drilling (UBD) system in a remote desert exploration well to directly evaluate the hydrocarbon reservoir inflow potential. The integrated sub-surface and well design team, planning, activity execution and results are discussed, with an assessment of the added value realized. The lessons learnt will be used to optimize the subsequent exploration and appraisal drilling activities, and in the longer term, optimization of subsequent field development activities.The vision is effectively to inflow test all available hydrocarbon reservoirs while drilling, thereby generating a pseudo reservoir inflow profile as a function of depth without the uncertainty of drilling induced formation damage. To achieve this objective, the available under balance drilling operating parameters and drilling fluids, were proactively controlled. This allowed the rig crew to manage the inflow while drilling, and near well bore skin damage, reducing the uncertainty to optimize the reservoir information acquired. The activity was executed in Q3 2007.Inflow testing in a known 'non damaged state' while drilling exploration and appraisal wells in desert areas remote from hydrocarbon processing and export infrastructure helps to reduce overall project risk. In low permeability reservoirs, over balance drilling induced near wellbore reservoir inflow impairment, has historically delivered inconclusive inflow data, resulting in higher project uncertainty and higher costs. UBD reservoir characterization information may be used to reduce subsequent well flow testing activities, which in turn, lowers project costs, speeds up the field appraisal process and reduces waste.
fax 01-972-952-9435.Abstract HSE training, implementation & production results for a long term underbalanced coil tubing multi-lateral drilling project.The methods used to safely implement the bp Sajaa CT UBD project from start up issues through implementation will be discussed. To date, 14 wells have been drilled successfully with no accidents, the decline in the gas production for the Sajaa field has been mitigated and additional reserves have been accessed. This has been achieved through a programme of training, teamwork and service company integration leading to new heights of HSE performance for the industry. In addition, the key learning's have been carried forward from well to well to optimise the economics of the project and open up new opportunities previously thought to be unfeasible. Through a series of innovative engineering applications, the future of the project has been secured.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.