Multilevel schemes for the layout of temporary and permanent spillways are presently used in the construction of high-head hydrodevelopments.Such schemes, corresponding to the technical level attained by Soviet gate construction, provides the release of considerable flows over a wide range of heads up to 100-130 m. The number of levels of spillway structures at high-head hydrodevelopments can be reduced by using high-head gates.This can effect a considerable economy, especially in the case of spillway tunnels, since the cost of each level amounts to 10-20 million rubles.At present designs have been developed for deep, mainly vertical-lift and radial gates which can operate satisfactorily under heads to 200 m for opening areas of up to 30 m 2. However, if the temporary discharges during construction are great, the spillway is built with a large number of openings, which adversely affects the hydraulics and leads to an increase in the spillway face, rock excavation, and capital expenditures. Therefore, the need for creating high-head gates covering openings greater than 30 m 2 at heads to 200-300 m is quite pressing.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.