Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches.
This paper is dedicated to the problem of stability prediction of the terrain above underground mining operations. After the initial introduction to the problem, then the short analysis of the model approaches used to solve it, and giving the algorithm for rock massif stability prediction, we describe the concept of the multiattirbute terrain stability prediction method. The application of the multiattribute prediction method for stability of the terrain above underground mining operations is presented on the example of the Brown Coal Mine Aleksinac. The used method is original, essentially different from the other methods of mathematical modeling, because its prognosis of the rock massif stability under the influence of underground mining operations is based on the balance of the stability indicators. Our comparative analysis of the results obtained by multiattribute prediction and the data obtained by measurements of real deformations and terrain settling in multiple mines shows high mutual correlation, with an average deviation of less than ±10%. These results are confirmed entirely on the example of the Brown Coal Mine Aleksinac
During the research on the subject of computer integrated systems for decision making and management support in mineral processing based on fuzzy logic, realized at the Department of Applied Computing and System Engineering of the Faculty of Mining and Geology, University of Belgrade, for the needs of doctoral thesis of the first author, and wider demands of the mineral industry, the incompleteness of the developed and contemporary computer integrated systems fuzzy models was noticed. The paper presents an original model with the seven staged hierarchical monitoring-management structure, in which the shortcomings of the models utilized today were eliminated
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.