This paper addresses an application of production scheduling problems in cable industry. In cases where the size and color of cable are changed, the cable industry is classified as a multiproduct, mass production system. Two different mathematical programming models based on continuous time representation are proposed for a case study on the scheduling problem of the cable industry to minimize the total cost including setup cost, operating cost, and inventory holding cost. As the solution methodology, different grouping policies, for example, grouping cables of the same size and grouping cables of the same color are proposed. Then different metaheuristic methods based on simulated annealing and variable neighborhood search algorithms are applied to minimize the total cost of proposed solutions. Finally, the solution with the smallest total cost is selected as the production schedule of the case study, while Xpress solver could not provide any feasible solution for the mathematical models in the problem size of case study.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.