Integrated Production Modeling (IPM) is probably the most popular suite of software for production optimization and planning. It affords the opportunity to model the entire production system from the reservoir through the surface gathering system to the process facilities. This paper describes applications of IPM to the various strategic decisions made in Tengizchevroil LLP (TCO).Within TCO, a full field IPM model is used for an integrated production capacity management plan considering three time periods: short, mid and long-term. Each model has its own strategic focus and is owned by a specific team, all working together in close communication. The short-term model is used to investigate the impact of field operations and surveillance on field production capacity so that all processing facilities are kept full. The mid-term model is used for debottlenecking and gathering system optimization, understanding new drilling hook-ups, and impact of workovers on system capacity. This model uses a time window of up to five years and is also used for Business Plan support. The long-term model, which is the core of this paper, focuses on major capital projects and is typically run for decades.The main objective of long-term IPM modeling is to run production forecasts while honoring surface constraints; keeping the existing and future processing facilities full is the desired outcome. The long-term model handles not only the oil system, but also sour gas injection and waste water disposal. It models all current gathering systems, with whatever modifications or short-term projects adopted by the mid-term model inclusive and future growth plans. Examples, lessons learned, and challenges of strategic decisions made by using IPM will be shown and discussed in this paper. This includes well count study, pipeline sizing, meter station assignment, timing of rigs and projects, and drilling schedule.One of the main lessons learned was the importance of cooperation with the reservoir simulation team in unifying constraints, incorporating the impact of reservoir uncertainty on production profiles, and developing mitigation strategies for unfavorable outcomes. Other value is derived from coordinating base business IPM results with those of the design team that handles future growth projects.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.