In practice, asymmetric formation disturbance occurs due to the sequence of excavation though parallel double-track tunnel is a typical symmetrical engineering. Based on a shield tunneling project of a section of the Suzhou Rail Transit under the subgrade of the Shanghai–Nanjing Expressway, a finite element model was established to obtain a numerical solution that was validated by the measured data to guarantee reliability. According to the construction characteristics of the shield method, two correction coefficients—namely the soil loss rate correction coefficient α and the settlement trough width correction coefficient β—were introduced. A modified Peck formula suitable for the preceding tunnel and the subsequent tunnel was proposed. The applicability of the modified Peck formula was verified by another similar project. The results showed that the numerical solution can better reflect the actual settlement of the highway subgrade under shield tunneling. The results calculated by the classic Peck formula had a large error in comparison with the measured data. The modified empirical formula could more accurately predict the settlement of the expressway subgrade caused by the shield method when α1 = 0.38 and β1 = 2.08 for the preceding tunnel and α2 = 0.29 and β2 = 1.99 for the subsequent tunnel.
When a pipe roof is used as a pre-support for the surrounding rock in a shallowly buried tunnel, accurate prediction of the support effectiveness of the pipe roof is important in order to ensure the rationality of the pipe roof structure design. Based on analysis of pipe roof pre-support effects, considering the construction time of pipe roof structures and the interaction mechanisms between the steel pipes of the pipe roof and the surrounding rock, we establish a calculation model of the surrounding rock pressure acting on each steel pipe of the pipe roof on the semi-circular pre-support boundary. Through comparison and analysis with the measured results, we demonstrate that the calculation model for surrounding rock pressure and the calculation model for stress and deformation of the pipe roof are reasonable. According to the deformation coordination conditions between the steel pipe of the pipe roof and the surrounding rock on the pre-support boundary and alongside the Peck formula, we establish a theoretical analysis method for pipe roof pre-support effectiveness based on the indexes of the ground loss rate, settlement trough width, and maximum ground surface settlement, thereby realizing a quantitative evaluation of pipe-roof pre-support effectiveness. At the same time, the effects of steel pipe diameter, circumferential spacing, and excavation footage length on the pre-support effectiveness of the pipe roof are analyzed. The conclusions can be used as a basis for the design and optimization of pipe roofs and as a guide for the application of pipe roofs.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.