The new Biosolids & Energy Recovery Facilities at the Irvine Ranch Water District (IRWD) Michelson Water Recycling Plant (MWRP) will include energy recovery from its anaerobic digestion biogas. As part of the design process, the IRWD conducted a study of to identify the most effective use of the biogas. The IRWD considered five biogas use options: use of biogas as an energy source for thermal drying process, cogeneration with microturbines or fuel cells, fuel source for engine driven pumps, and cleaning to near natural gas quality for injection into the natural gas pipelines. Prior to the evaluation of biogas utilization options, IRWD had identified fuel cell power generation as the preferred strategy because it maximized power generation and has the potential for financial incentives. However, as a result of the evaluation, microturbines were selected for implementation due to (1) the highest non-economic ratings, (2) cost effectiveness (only slightly higher cost than the base case), (3) lower sensitivity to fluctuations in financial incentives, and (4) added plant reliability. Key to the decision to implement microturbines rather than fuel cells is the uncertainty associated with California financial incentives.
The Irvine Ranch Water District (IRWD) sends solids streams from their Michelson Water Reclamation Plant (MWRP) to the Orange County Sanitation District (OCSD) for treatment. Both the OCSD and IRWD came to the conclusion that the methodology used to determine the amount that IRWD was paying OCSD for this treatment was not equitable, so they commissioned a joint study to determine what the equitable payment should be. The goals of this study were to develop a new payment methodology that was both equitable and easy to implement. The key to success on the project was using an objective analytical process and decision-making methodology, and applying them in a workshop environment, which took the emotion out of a historically volatile topic between IRWD and OCSD. This paper describes the process undertaken to develop and implement the new payment methodology.
The City of Irvine, CA (City) uses reclaimed water produced at its Michelson Water Reclamation Plant (MWRP) for landscape irrigation and sanitary flushing, and is planning to increase production capacity from current 18 million gallons per day (mgd) to 33 mgd.In order to ensure sufficient wastewater feed for the planned expansion at MWRP, the Harvard Avenue Trunk Sewer (HATS), which currently flows to the Orange County Sanitation District (OCSD), must be re-routed to the plant. IRWD currently pays OCSD to treat the HATS flow at its wastewater treatment Plant No. 1 facility in Fountain Valley, CA.The re-routing of the 9 mgd build-out flow of the HATS to MWRP would have the dual benefit of providing the wastewater feed needed at MWRP to produce the additional reclaimed water, plus eliminating the payment of fees to OCSD. This makes the economics of this project particularly attractive. This paper is an account of the various schemes that were evaluated to re-route the HATS flow to MWRP. The fully developed urban project area required collaborative brain storming sessions with the Client to identify the potentially feasible alternative schemes. Alternatives included: pump station and forcemain, gravity line and lift station, and gravity line alone, at various locations and alignments.Diurnal flows were updated using data collected over 6 months to generate design diurnal curves for the project (Figure 2). The curves were used to estimate the current and future inflows to the system and identify available unused capacities in existing trunk sewers. The Storm Water Management Model (SWMM) was used extensively to analyze the hydraulics of the various alternatives, identify bottlenecks and surcharge locations, and to size and optimize the components of the proposed schemes. The final selected alternative consists of a diversion structure, gravity line to a pump station equipped with dual odor control facilities, forcemain that leads to a vortex drop structure, and a junction structure to connect to an existing trunk sewer.The project was so attractive that the City expedited implementation by opting for the "designbuild" method of project delivery so as to have the project on-line by February 2008. The Engineer prepared the design-build RFP package, which specified the Design Basis and the 15% design of the selected alternative. The project was awarded in April 2007, with a contractual completion date of July 2008.This project is a show-case example of how thorough Engineering Studies combined with a collaborative approach with the Client can lead to effective implementation of the optimized solution in a timely manner.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.