The paper discusses conceptualization, design and implementation of the first ever inflow tracer technology application in UAE carried out in an Abu Dhabi offshore field. Working in offshore environment has challenges related to operations, cost, resource requirements and HSE that requires innovative and cost-effective solutions to improve efficiency. In recent years, controlled release smart tracers have carved out a niche as a proven solution for extended life fluid flow monitoring, thus allowing the engineers and geoscientists to better understand fluid inflow patterns in a well leading to informed decisions on reservoir management and production optimization. Smart tracers have the capability to detect, quantify and monitor phase breakthroughs and understand subsequent influx behavior in the well. Being a pioneer project, critical focus was placed on design, execution, and cost optimization. Smart tracer technology was chosen over conventional production logging as it provided production profile monitoring over time compared to single time measurement when using production logging, substantially lower operating cost as well as no production intervention. A flowback calculation was used inputting static and dynamic reservoir data to understand the flow dynamics that the tracers would encounter. Reservoir permeability profiles, image logs and hole rugosity were utilized to identify potential areas of influx along the wellbore and strategically place specially designed smart oil and water tracers along the ~3300 feet long lateral. Strictly adhering to local environmental regulations, a thorough offshore job hazard analysis was carried out and a risk matrix was framed. A specialized first of a kind closed loop customized sampling procedure was invented to de-risk a hydrogen sulfide (H2S) hazard present during sampling operations. The paper describes the initial results for the first well in the campaign. Sampling strategy consisted of two phases: high-frequency immediately after well commissioning followed by steady state sampling. Samples were collected at the wellhead and analyzed for tracer breakthroughs. Results showed a good calibration with conventional production logging, confirmed well clean-up and yielded crucial information on zonal flow contribution. Utilizing a local cost model, smart tracer technology was found to offer typical cost savings in the order of US$10 million for a ten well program over five years as compared to conventional production logging. The paper offers insights into the first application of controlled release tracers in offshore Abu Dhabi highlighting the best practices in project design, techno-economics, hazard analysis and operational excellence. The success of the project is the first major step towards embracing this advanced technology for reservoir monitoring and surveillance. This opens opportunities for similar applications elsewhere with significant potential to incentivize life-cycle cost of reservoir management and improve hydrocarbon recovery.
This paper describes optimal field development and appraisal in complex reservoirs and challenging environments in field ‘ABC’. Most of the wells are laterals with ICD (lower) completions across heterogeneous carbonate reservoirs. Highly corrosive environments i.e. up to 20% H2S present an added risk, particularly in the event of water encroachment. Optimal development needs a multi-disciplinary surveillance approach involving an integration of input form stakeholders, including geoscience and petroleum engineering, to ensure productivity optimization during the whole life of the field. Field ABC is an offshore field with extremely heterogeneous carbonate reservoirs and acid stimulation is usually done to improve production. The wells in the field are mostly horizontal, oil producers with ICD lower completions. The upper completion uses carbon steel L80 and for corrosion mitigation, inhibitors are injected through chemical injection valves. In this paper, a pilot well is reviewed where a methodical approach was used for evaluation. Baseline production logging and reservoir saturation monitoring were done in the lower completion and a corrosion log was acquired in both the upper and lower completions. Data acquired was integrated and observations show that the measurements correlate well with each other. This case study integrates and correlates downhole zonal contribution, phase holdups, pressure and temperature data from production logging with metal loss data from a high-resolution multi-finger caliper tool. Well trajectory shows a depression across the heel of the well which is incidentally between the EOT and the topmost ICD. Although there is no water production at surface, a static water sump is observed across this depression on the production logs. This static water is possibly completion fluid or unremoved fluid from the acid job. Minor localized corrosion is also observed across the same depression on the corrosion logs, also confirming presence of some water. The H2S production and the presence of water is an added risk to completion integrity as it creates a corrosive environment. Therefore, in such cases it will be necessary to monitor the production and corrosion at regular intervals of time. This case study shows that by applying a multi-disciplinary approach and integrating various measurements, well conditions can be viewed not just as pieces of a puzzle but as a complete picture to improve the understanding of the well behavior. Time-lapse monitoring of production and corrosion along with reservoir saturation is also necessary to prevent surprises and help in making informed decisions towards better field development.
The workflow is implemented for designing Lower completion with inflow control devices &/or inflow control valves (ICD/ICV) for high departure long horizontal wells in a Green Field located North West offshore Abu Dhabi. The major challenges that being faced in the field development include reservoir heterogeneity with high permeability contrast ranging from 0.1 to 500 md, fault network and high uncertainty about Tar Mat surface & Oil Water contact. Main objectives of ICD/ICV completions are; to have uniform influx/flow profile from all sublayers of reservoir by dividing horizontal drain in compartments based on reservoir properties variations, minimize heel to Toe effect, controlled inflow from high permeability streaks, without compromising total well deliverability; most importantly to encourage more inflow from the lower permeability regions. The ICD/ICV Completion design workflow utilized in the industry and available in literature was followed along with new improved & integrated approach of dynamic simulation modelling. An appropriate reservoir sector model having one deviated gas injector, one/two horizontal water injector(s) and one ICD/ICV candidate oil producer was extracted to be used for this study. Single time step static modelling and dynamic sector modeling simulation approaches were implemented for ICD/ICV modeling. The dynamic simulation model workflow included Local Grid Refinement across the candidate well & gas injector along with well segmentation. Sensitivity & optimization cases include Open hole (base) case, ICD/ICV completions with different nozzles sizes, and varying compartment/segment lengths for better control & improving oil flow profiles, and cumulative oil production. This workflow has provided valuable design data prior to drilling this challenging horizontal well candidate, lower completion equipment allocation based on compartment requirements and final optimization of ICD/ICV after receiving open hole logs; where latest suit of logs were run, are discussed in this paper. The completion design of the well resulted from this workflow included ICD configurations with swell packer arrangements to create 8 compartments along the reservoir section. Simulation results from ICD/ICV completion proved successful in delaying water & gas breakthrough in representative multi-well dynamic sector model. This Workflow adopted by the team in designing the lower completion resulted in successful installation of the ICD(s) & ICV(s) in the field for various oil producer wells. This paper also covers the challenges being faced while real time fine tuning of ICD/ICV design model. This workflow would be useful for any future designing & applications of this type of smart completions for any field worldwide with similar challenges.
In a green field located in offshore Abu Dhabi, a new well was drilled in an oil-bearing zone and was completed with slotted liner inside a 6-in horizontal drain hole. Abnormally high gas rates were reported during the surface production testing of this well. This paper highlights the unique use of a new pulsed neutron tool combined with an advanced production logging tool for assessment of the well performance and identification of the source of gas breakthrough. This combination of advanced technology tools with measurements from array flowmeters, optical gas holdup sensors, and a new generation pulsed-neutron tool was deployed in the well to provide reliable flow type, borehole, and formation measurements in a gas environment. A multidisciplinary approach involving production engineering, petrophysics, and well integrity was essential in diagnosing this unexpected issue of high gas production. An integration of the various results from production logging, the pulsed neutron measurements, and open-hole and cement log data has helped in confirming the source of the produced gas. The acquired production log (PL) data revealed gas entry from the top of the lower completion and no presence of free gas below that depth. The zonal contributions from the horizontal lateral quantified from the acquired data also helped in assessing the productivity of the reservoir. The pulsed neutron log (PNL) measurements were acquired in the second run, which then helped confirm the borehole fluid properties and to identify and quantify the formation fluids. Combining the PNL and PL data helped identify the gas entry point accurately. Based on the integrated data interpretation, it was confirmed that the gas could not originate from the reservoir being produced through the lower completion and that there must be gas channeling downward through channels in the cement behind the casing from a gas reservoir above the oil reservoir. The unique use of the advanced PNL data and its integration with other log data facilitated the successful identification of the gas source and quantified zonal contributions in a challenging logging environment.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.