Cluster tools are the key equipment in semiconductor manufacturing systems. They have been widely adopted for many wafer fabrication processes, such as chemical and physical vapor deposition processes. Reentrant wafer flows are commonly seen in cluster tool operations for deposition processes. It is very complicated to schedule cluster tools with reentrant processes. For a dual-arm cluster tool with two-time reentering, the existing studies point out that a one-wafer periodical (1-WP) schedule can be found, and it is optimal in terms of productivity. However, for some wafer fabrication processes, wafers should be processed at some PMs more than two times. This gives rise to a question of whether there still exists a 1-WP schedule for dual-arm cluster tools with the number of reentering times being more than two such that the cycle time of a tool can reach the lower bound. This problem is still open, and this is what this work wants to tackle. For a dual-arm cluster tool with the number of reentering times being k (>2) times, if there does not exist a value f ∈ {1, 2 …} such that k = 3f, theoretical proofs are given to show that a 1-WP schedule can be found, otherwise it does not exist. For cases with a 1-WP schedule, the cycle time can be obtained by analytical expressions. For the cases without a 1-WP schedule, two new methods for a three-wafer periodical schedule are proposed to improve the system productivity by comparing it with an existing three-wafer periodical schedule. The applications of the obtained results are demonstrated by examples. Wafer residency time constraints are required for some wafer fabrication processes. Note that the results obtained in this work cannot be directly applied to cluster tools with both reentrant wafer flows and wafer residency time constraints. Nevertheless, schedulablity and scheduling analyses for that applications can be conducted based on the obtained results in this work.
To ensure wafer quality, engineers have to impose wafer residency time constraints and chamber cleaning operations on cluster tools; this has been widely used in semiconductor manufacturing. Wafer residency time constraints and chamber cleaning operations make the scheduling problem of cluster tools more challenging. This work aims to solve such a scheduling problem for single-arm cluster tools and presents a novel method based on the use of virtual wafers. Under a one-cyclic schedule obtained for single-arm cluster tools without chamber cleaning requirements, virtual wafers are loaded into the tool such that when a process module (PM) processes virtual wafers, a chamber cleaning operation is performed in practice. The key to solve this scheduling problem is to find a wafer loading sequence with the highest performance in terms of cycle time. With this idea, this work constructs a genetic algorithm to search for such a solution. Since the obtained solution is a periodical wafer loading sequence based on a one-wafer cyclic schedule, it can be easily implemented. Therefore, this work has high practical value to numerous semiconductor manufacturers. Experiments were performed to show the efficiency and effectiveness of the proposed method.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.