Since it was difficult in the atmosphere to obtain a deeper anaerobic environment, most previous investigations for drawing conclusions to further study denitrification and phosphorous removal, especially biological P removal, were based on the operations of SBR or full-scale reactors. In this study, a 4 L/h of continuous flow enhanced biological phosphorus removal (EBPR) reactor was constructed and started up, and activated sludge and EBPR performances were monitored for 365 days. The analysis of suspended solids (SS) and flow velocity at different temperature stages, indicated that the poor return activated sludge (RAS) was caused by the large dynamic friction of sludge in the larger specific surface area flow field. The start-up time of the bio-reactor feeding 5 mg-P/L and the ≥88% removal efficiency was extended to 200~365 days, with the relative abundance of polyphosphate accumulating organisms (PAOs) + polyphosphate accumulating organisms (GAOs) above 12.2% at the genus level after its stabilization. The results of the start-up phase showed that the key to a lab-scale continuous flow reactor was smooth RAS. If the problem was better settled, it would provide a promising and practical alternative for further study on N and P removal.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.