The article describes the main principles of estimating volumetric parameters of gas onshore deposits in low-permeability reservoirs of the Turonian stage that were formed as a result of the long-term study of “supra-Cenomanian” sediments at the fields of Rosneft Oil Company PJSC, in particular, at the largest Kharampurskoye oil and gas condensate field. Based on a detailed analysis of the section, the authors formulated recommendations for optimal logging suite, well testing and analysis of the core taken from highly swellable clay rocks of the Kuznetsov formation.
The task of choosing the sidetrack trajectory for drilling is one of the most common among specialists while workovers planning in oil and especially in gas fields. This task is solved by reservoir engineers, geologists and drilling engineers, both in a team and separately. Despite the widespread use of software for processing and analyzing the data and high automation of most routine tasks, many oil and gas companies lack a unified methodology for choosing sidetrack trajectory. Each oil and gas company has its own approach to this task. Usually, the process of analyzing candidates is based on the expert opinion of the well design engineer and has several limitations, such as: ▪Short deadlines - on average, it takes from two to three weeks to select the sidetrack drilling trajectory.▪Low automation of the process of creating and analyzing the trajectory - the trajectory is created by a specialist manually, this process takes, considering the time for analysis, from two to four days for one trajectory. As a result, about five candidates are considered for the allotted time.▪Analysis of a small number of influencing factors — two-dimensional maps of averaged permeability, residual reserves maps, a seismic map of average amplitudes, as well as the proximity of the candidate to the existing well stock are mainly considered during analysis of the trajectory.▪Prediction of the flow rates is not always based on the hydrodynamic model - when calculating the candidate's starting flow rate due to tight deadlines, not all trajectories are analyzed using the hydrodynamic model, for part of the trajectories flow rates are calculated only using analytical techniques, such as the Joshi equation (Joshi, 2018).▪The risk of human factor. Sidetrack drilling, like other workovers, is aimed at increasing the flow rate of the well and the cumulative production of the entire field. In gas fields with falling production and high drilling density, sidetrack drilling can help significantly extend production time with the same level or increase production. Drilling a sidetrack, rather than a new well, can significantly reduce drilling costs, since the main well has already been drilled. Potentially, almost any well, especially with falling production rate or high water cut, can be a candidate for sidetrack drilling. According to the data from the Federal Supervision of Natural Resources in 2017, almost a quarter of all wells in Russia are inactive or shut, which is almost 60,000 wells.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.