Systematic geochemical mapping based on sampling and analysis of surface soils (0-2 cm) has been carried out in several Norwegian cities. The soils in the oldest parts of the cities are contaminated with metals (especially Pb) and polycyclic aromatic hydrocarbons (PAH). Due to the fact that children are often in contact with surface soil, it was realized that special focus had to be directed towards soils in day-care centers and playgrounds. The first mapping and remedy program was initiated in Trondheim in 1996. Here, the importance of copper-chromium-arsenic (CCA)-pressure-impregnated wood in playing equipment as a pollution source for soils was documented, and a process was started with the aim to ban this product. Soils from day-care centers in the inner city of Bergen were polluted to a degree that required remediation in 45% out of 87 centers, mainly due to high concentrations of Pb and benzo(a)pyrene. In Oslo, 38% of 700 day-care centers needed remediation due to soil pollution by Pb, BaP, Cd, Hg, Ni and PCB. Removal of CCA-impregnated wood was necessary in more than half of the day-care centers The Norwegian parliament has decided to investigate all outdoor playing areas in day-care centers, playgrounds and schoolyards in Norway, starting in 2007 with day-care centers in the ten largest cities and five most important industrial areas. The Norwegian Institute of Public Health has developed quality criteria for soils in day-care centers and playgrounds for As, Cd, Cr(6+), Hg, Ni, Pb, zinc, PAH(sum16), benzo(a)pyrene, and PCB(sum7). The Geological Survey of Norway has developed guidance for mapping of soil pollution (sampling, chemical analysis and reporting) in day-care centers. Especially the sampling strategy has been developed in the period 1996-2007, and the preferred sampling strategy is to collect at least 10 samples of surface soil (0-2 cm) from (1) "original soil" on the site, (2) artificial man-made "hills", and (3) soils used for growing vegetables. A total number of 2,000 day-care-centres are to be investigated, and necessary remediation should be completed before the end of 2010.