The example of industrial and residential areas shows the negative impact of the processes of underfl ooding of territories, on the operational reliability of real estate objects. The causes of the manifestation and development of these complex processes are revealed. To overcome the anthropogenic impact on groundwater, technological recommendations have been proposed, economic and social nature.
Experimental tests show that velocities of seismic vibrations from quarry blasts generally lower as delay intervals between large-scale blasts are increased. At the same time, a seismically safe delay interval is governed by geological conditions, which vary appreciably within an open pit mine field, and by geotechnical conditions of mining. This study was aimed to obtain theoretical formulas of vibration velocities, compressive stresses and relative strains in rock mass as functions of the delay interval based on the mechanism of seismic waves induced by short-delayed blasting in jointed rock mass. These formulas were to be justified. After review of reference sources, the mechanism of blast-induced seismic waves in jointed rock mass was developed. According to this mechanism, high-velocity collisions of fractured and intact blocks under the action of pressure from detonation products generate elastic waves. The theoretical research allowed formulas for the delay interval dependence of the vibration velocities, compressive stresses and strain rates in rock mass in the seismic impact zone of blasting. The comparison of the mathematical and numerical analysis results with the actual practice data validates the formulas of vibration velocities as function of blast-to-blast delay intervals. These formulas make a framework for the development of regulations for blasting at minimized seismic impact on guarded objects in different geological and geotechnical conditions.
Generalization of the abundant experimental and theoretical research accomplished by Russian and foreign scientists in the 20th–21st centuries enables distinguishing between a few action zones of blasting, namely, crushing zone (fine grain crushing), radiating cracking zone, induced-fracture zone, shaking zone (residual stress after blasting), and blast-induced load zone. In the crushing zone, overgrinding takes place, which has an adverse influence on efficiency of processing of uranium, for instance, or granular quartz. The radiating cracking zone size in blasting in fractured rock masses governs the quality of drilling and blasting. The induced-fracture zone determines stability of rock mass and, consequently, safety of production processes both in surface and underground mines. In the shattering zone, fractured rock mass experiences residual stresses, which induces new fractures and rock falls, or dynamic events due to lithostatic pressure in rockburst-hazardous rock mass. This article aims at the experimental and theoretical determination of geometrics of blast-induced impact zones in different geological and geotechnical conditions with a view to developing appropriate actions toward abatement of the adverse effect exerted by these zones on geomechanical and technological processes in the course of mining. The theoretical formulas are given for the radii of the crushing, radiating cracking, induced fracturing and residual stress zones. Reliable applicability of the formulas in actual mining is proved by comparison of the calculations with the full-scale testing data. To mitigate the crushing zone impact, it is possible to charge the wellhead interval with a radial air gap, which decreases density of charging. Arrangements toward reduction of the zones of induced-fractures and residual stresses are proposed. Energy of the man-mane zone of residual stresses after blasting can be targeted at activation of raise driving with raise borer 2KV.
Today, the impact of urbanized territories on the geological and hydrogeological environment is of paramount importance. The studied section of the city of Kursk “Severny” district is intensively built up, therefore, it is characterized by a high degree of technogenic impact.. This article presents the results of engineering and geological surveys on the built-up territory of the Kursk city agglomeration. A hydroisogypsum map was built, the flow filtration rate was calculated, and it’s direction was determined. Protective measures were also proposed to prevent flooding of the built-up area. Statistical processing of the primary material was performed, followed by modeling of hydrogeological conditions in the software package ArcGis, Autocad..
Economic appraisal of urban lands requires cartographic documents and point assessment. The purpose of the present studies is the creation of thematic cadastral maps and accompanying material. There were used the methods of mathematical statistics, comparative analysis, map modeling. The result of these studies can be used while making a comprehensive economic assessment of a city based on the existing regulatory framework. This article focuses on the environmental impact as one of the factors of integrated cadastral valuation.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.