The availability and efficiency of a wind power system are highly affected by the failure or the unreliable operation of its power converter. This paper investigates the failure rate and annual consumed lifetime for a 2 MW direct-drive permanent magnet synchronous generator (PMSG) based full-scale converter in a wind power generation system. The reliability assessment mainly focuses on the component level, namely, diodes and IGBTs, in both of the machine-side converter (MSC) and the grid-side converter (GSC). Annual damages and power cycles for semiconductors are calculated separately under long-term thermal cycles (several seconds to hours) and short-term thermal cycles (dozens to hundreds of milliseconds). Experiments regarding thermal stress measuring for different semiconductors under short-term thermal cycles are affiliated. A comparison between different thermal cycles is given and discussed in detail. To ensure a visualized time-to-failure evaluation, a Monte Carlo method is used to generate the lifetime distributions and entire unreliability functions for power semiconductors. Final B10 and B1 lifetimes can easily be observed from the cumulative distribution functions (CDFs). Moreover, different standard deviations are assumed for parameters in the Bayerer's lifetime model, and by using several parallel Monte Carlo algorithms, parameter sensitivity to the final lifetime evaluation is analyzed.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.