Under China’s modern development concept, it is necessary to promote the application of electric equipment to improve the construction environment of high-altitude railway tunnels and to address the efficiency reduction in high-altitude construction of traditional fuel oil equipment. Based on the analysis of the development status of electric equipment for tunneling projects in China, a tripartite evolutionary game approach is used to establish the game payment matrix of the government, equipment manufacturers, and construction units. The impact of the relevant parameters on the tripartite strategy is investigated based on numerical simulations. It has been shown that in the early stages of popularization and application, the government should actively regulate and control, and in the later stages of popularization and application, the government should play a leading role in market mechanisms. Evolutionary stability strategies are affected by the brand revenue that manufacturers earn through technological innovation on electric equipment and the additional research and development costs that need to be paid. The conclusions of this study can help provide a reference for the promotion and application strategy of electric equipment in China’s plateau railway tunnels.
PurposeThe mega railway infrastructure projects are faced with complex environments and multi-level management challenges. Thus, the mega railway infrastructure project management system not only needs to focus on its composition, but also needs to consider changes and impacts of internal and external environment.Design/methodology/approachThis study attempts to introduce the concept of dissipative structure from the perspective of complexity theory and constructs a positive entropy and negentropy flow index system for mega railway infrastructure project management system in order to analyze the factors of management system more deeply. The Brusselator model is used to construct the structure of the mega railway infrastructure project management system, and the entropy method is used to calculate the positive entropy and negentropy values to verify whether the management system is a dissipative structure.FindingsA plateau railway project in China was used as an example for an empirical study, not only its own characteristics are analyzed, but also the role of constraints and facilitation of the internal and external environment. Based on the research results, several effective suggestions are put forward to improve the stability and work efficiency of mega railway infrastructure project management system.Originality/valueThis study demonstrates that mega railway infrastructure project management system has the characteristics of dissipative structure. It can provide theoretical support for the development of mega railway infrastructure project management system from disorderly state to orderly state.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.