Field development planning is one of the core business processes in the upstream oil and gas industry. Before a discovered field can be developed and its hydrocarbon produced, proper evaluation and planning of the subsurface reservoirs and surface facilities are necessary to ensure that the field development plan is not only economical to undertake, but also flexible enough to cater for any deviation from the original plan during implementation as a result of inherent uncertainties in the reservoirs over the production life span of the field. This paper describes the approach taken to prepare a Field Development Plan (FDP) for a cluster of gas fields located offshore Peninsular Malaysia. The four gas fields namely Melor, Laho, Tangga and Tangga Barat ("Tangga Barat Cluster" in short) are located within a 25 km radius of each other at a common centre. One common denominator among these fields is the presence of carbon dioxide (CO2) in its reservoirs. The Tangga Barat Cluster fields will be developed with Tangga Barat as the central processing complex, designed for a peak capacity of 440 MMscf/d of raw gas with an initial blended CO2 level of 37 mol % prior to CO2 removal. The raw gas will be processed, pre-treated and CO2 content reduced to below 8 mol % for evacuation to Peninsular Malaysia via an existing infrastructure. The key areas emphasized in the preparation of the field development plan include the business driver, resource assessment, depletion strategy, development concept and selection, managing uncertainties, appraisal requirements, reservoir management, anticipating production problems and disposal of the excess CO2. Introduction The Tangga Barat Cluster fields are located about 150 to 170 km northeast of Kertih, Terengganu offshore Peninsular Malaysia (Figure 1). The Tangga Barat Cluster consists of four gas fields; Melor, Laho, Tangga and Tangga Barat. In the vicinity are two producing fields, Resak which is a gas development located about 51 km southwest of the Tangga Barat field and Dulang, an oil development situated about 20 km south of Tangga Barat. The Tangga Barat Cluster fields were discovered from 1980 to 1993; they remain undeveloped due to the presence of CO2 in its reservoirs, the content level of which is beyond the gas specification required for gas sales. Since then, a total of 10 exploration and appraisal wells have been drilled before the final FDP was submitted and approved by PETRONAS, the host authority for upstream oil and gas business in Malaysia.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.