2021
DOI: 10.3926/jiem.3438
|View full text |Cite
|
Sign up to set email alerts
|

A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time

Abstract: Purpose: This research develops a batch scheduling model for a three-stage flow shop with job processors in the first and second stages and a batch processor in the third stage. The model integrates production process activities and a product inspection activity to minimize the expected total actual flow time.Design/methodology/approach: The problem of batch scheduling for a three-stage flow shop is formulated as a mathematical model, and a heuristic algorithm is proposed to solve the problem. This model appli… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 14 publications
(19 reference statements)
0
2
0
Order By: Relevance
“…An extension of the total actual flow time criterion is observed in batch scheduling problem within flow shop systems [32]- [34]. Halim and Ohta [32] examined the scheduling problem into two sub-problems, namely batch and scheduling.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…An extension of the total actual flow time criterion is observed in batch scheduling problem within flow shop systems [32]- [34]. Halim and Ohta [32] examined the scheduling problem into two sub-problems, namely batch and scheduling.…”
Section: Introductionmentioning
confidence: 99%
“…In the scheduling sub-problem, batch sequences are developed through semienumeration using the pairwise interchange method. While the solution in Halim and Ohta [32] does not guarantee to produce an optimal solution, it [32] has inspired and been developed for other flow shop problems, including in [33] and [34]. Suryadhini et al [33] discussed batch scheduling problems assuming two product types in a two-stage flow shop, while Maulidya et al [34] developed a two-stage flow shop model with continuous batch sizes [35]- [37].…”
Section: Introductionmentioning
confidence: 99%