2003
DOI: 10.2172/821328
|View full text |Cite
|
Sign up to set email alerts
|

A business case for on-site generation: The BD biosciences pharmingen project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2005
2005
2022
2022

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 3 publications
0
4
0
Order By: Relevance
“…The Distributed Energy Resources Customer Adoption Model is a sort of model that can anticipate DER uptake by commercial clients. Early results demonstrate that, in all cases studied, ordinary business clients can embrace DER: [105] appears to be the first time a tiny gas turbine producing system feeding a microgrid is disclosed; [106] examines a DER business case at the "San Diego biotechnology supply company BD Biosciences Pharmingen", which evaluates DERs for a facility with a base load of 200-300 kW. The site is simulated as a DER-CAM, which is comparable to a model created at "Berkeley Lab" to find the most cost-effective DER system for a particular location.…”
Section: Addressing the Limitations Of Microgridsmentioning
confidence: 96%
“…The Distributed Energy Resources Customer Adoption Model is a sort of model that can anticipate DER uptake by commercial clients. Early results demonstrate that, in all cases studied, ordinary business clients can embrace DER: [105] appears to be the first time a tiny gas turbine producing system feeding a microgrid is disclosed; [106] examines a DER business case at the "San Diego biotechnology supply company BD Biosciences Pharmingen", which evaluates DERs for a facility with a base load of 200-300 kW. The site is simulated as a DER-CAM, which is comparable to a model created at "Berkeley Lab" to find the most cost-effective DER system for a particular location.…”
Section: Addressing the Limitations Of Microgridsmentioning
confidence: 96%
“…xxxiv During the process of developing DER-CAM, case studies were performed by the LBNL DER team Firestone et al 2003). The intent of the case-studies was to validate DER-CAM by comparing investment solutions posed by DER-CAM with those chosen by sites.…”
Section: Dg Case Studiesmentioning
confidence: 99%
“…xxxiv During the process of developing DER-CAM, case studies were performed by the LBNL DER team (Bailey et al 2003 andFirestone et al 2003). In order to be expressed as a MILP, randomly generated scenarios are used to represent stochastic parameters.…”
Section: Dg Case Studiesmentioning
confidence: 99%
“…During the process of developing DER-CAM, case studies were performed by the LBNL DER team, including the author of this dissertation (Bailey et al 2003 andFirestone et al 2003). The intent of the case-studies was to validate DER-CAM by comparing investment solutions posed by DER-CAM with those chosen by sites.…”
Section: Dg Case Studiesmentioning
confidence: 99%