1982
DOI: 10.1109/tcs.1982.1085095
|View full text |Cite
|
Sign up to set email alerts
|

A Clustered Dynamic Model for a class of LInear Autonomous Systems Unsing Simple Enumerative Sorting

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
20
0

Year Published

1995
1995
2014
2014

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 65 publications
(20 citation statements)
references
References 14 publications
0
20
0
Order By: Relevance
“…However, it can be more convenient to extract a model with essentially the same features as this swing-equation representation from the DAE model (2) or the state-space model (4). If (4) is the starting point, then among the state variables in z one almost invariably has the generator (angular) position and velocity perturbation vectors S and w respectively.…”
Section: Sme Proceduresmentioning
confidence: 99%
See 1 more Smart Citation
“…However, it can be more convenient to extract a model with essentially the same features as this swing-equation representation from the DAE model (2) or the state-space model (4). If (4) is the starting point, then among the state variables in z one almost invariably has the generator (angular) position and velocity perturbation vectors S and w respectively.…”
Section: Sme Proceduresmentioning
confidence: 99%
“…[ 3 ] , [4], [5], to identify coherent groups of generators in a large model. The slow-coherency approach actually yields direct possibilities for equivalencing, although these have been explicitly addressed only for the case of low-order generator models that capture just the swing dynamics, see [ 5 ] , [6].…”
mentioning
confidence: 99%
“…This is the ideal of power system post-emergency control [15]. We propose to deploy www.ietdl.org the multi-agent systems by using the nesting method of a decomposition in graph theory [16,17] as follows.…”
mentioning
confidence: 99%
“…A 22 . A 222 with a to be a 1 , a 2 , a 3 [16,17]. Because the post-emergency control is to cope with the uncertainty of power system operation, it is impossible to know whether within each layer, the sub-system is stable or not.…”
mentioning
confidence: 99%
See 1 more Smart Citation