2022
DOI: 10.1016/j.buildenv.2022.108865
|View full text |Cite
|
Sign up to set email alerts
|

A critical review on BIM and LCA integration using the ISO 14040 framework

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
24
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 59 publications
(24 citation statements)
references
References 45 publications
0
24
0
Order By: Relevance
“…An LCA study was conducted according to International Organization for Standardization (ISO) standards 14040 and 14044 37,38 . This study attempts to compare the environmental impacts of different co‐generation system designs on a life cycle.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…An LCA study was conducted according to International Organization for Standardization (ISO) standards 14040 and 14044 37,38 . This study attempts to compare the environmental impacts of different co‐generation system designs on a life cycle.…”
Section: Resultsmentioning
confidence: 99%
“…An LCA study was conducted according to International Organization for Standardization (ISO) standards 14040 and 14044. 37,38 This study attempts to compare the environmental impacts of different co-generation system designs on a life cycle. The flow sheet and model boundary for the co-generation process of rice straw pyrolysis are depicted in Figure 11.…”
Section: Lca For the Co-generation Processesmentioning
confidence: 99%
“…It is focused on the definition of regulations, standards or of a cycle of actions, adjustment to the environment and accommodation to change. For example, ISO 14040 standard for environmental management can be cited [42]. In other words, this approach defines sustainable agricultural practices in order to provide some guidelines, conceptual framework and checklists.…”
Section: State Of the Art About Approaches To Ensure The Social Econo...mentioning
confidence: 99%
“…Traditional methods of quota or list measurement and pricing require significant time, manpower, energy and attention (Du, 2021). On the other hand, BIM technology provides powerful tools for project cost estimation with an acceptable accuracy through facilitation of computations related to quantity take-off (QTO) and BoQ and employing 3D models supplemented by life cycle analysis (Tam et al, 2022;Vit asek and Mat ejka, 2017;Fazeli et al, 2021).…”
Section: Evaluating Efficiency Of 3d Factors Extractable From Bim And...mentioning
confidence: 99%