A dynamic system approach to risk analysis for megaproject delivery

Abstract: This article describes a dynamic systems approach to quantitative risk assessment and simulation in megaprojects with regard to social, technical, economic, environmental, and political (STEEP) issues relating to sustainability at construction stage. A literature review was conducted to justify the needs for such a dynamic systems approach that originally integrates the functions of two sophisticated quantitative methods including the analytic network process (ANP) and the system dynamics (SD) for an advanced … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 58 publications
0
4
0
Order By: Relevance
“…Methods used for risk assessment in construction projects include the analytic hierarchy process, fuzzy comprehensive evaluation, Delphi, Monte Carlo simulation, system dynamics, etc. [14,17,[54][55][56][57][58][59][60][61]. Table 2 shows some general methods commonly used for risk assessment in construction projects.…”
Section: Risk Assessment Methods and System Dynamicsmentioning
confidence: 99%
See 3 more Smart Citations
“…Methods used for risk assessment in construction projects include the analytic hierarchy process, fuzzy comprehensive evaluation, Delphi, Monte Carlo simulation, system dynamics, etc. [14,17,[54][55][56][57][58][59][60][61]. Table 2 shows some general methods commonly used for risk assessment in construction projects.…”
Section: Risk Assessment Methods and System Dynamicsmentioning
confidence: 99%
“…Through SD, Nasirzadeh modeled the interdependent components and external interactions of machine breakdown risk and quantified the full impact of this risk on the duration and cost of a bridge construction project [65]. Generally speaking, the steps of system dynamics modelling include [59,60]:…”
Section: Risk Assessment Methods and System Dynamicsmentioning
confidence: 99%
See 2 more Smart Citations