2015
DOI: 10.1016/j.ijepes.2014.10.005
|View full text |Cite
|
Sign up to set email alerts
|

A fuzzy chance-constrained program for unit commitment problem considering demand response, electric vehicle and wind power

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
26
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 87 publications
(26 citation statements)
references
References 24 publications
0
26
0
Order By: Relevance
“…Eqs. (28) and (29) refer to the requirements of total contingency reserve and spinning reserve in the system, where CR1 is 5% of hydro generation + 7% of other conventional generation (excluding intermittent generation) + 10% of intermittent generation (wind power, solar power, etc. ), and CR2 is the power loss due to the outage of the largest generating unit at each hour [32].…”
Section: Constraintsmentioning
confidence: 99%
See 1 more Smart Citation
“…Eqs. (28) and (29) refer to the requirements of total contingency reserve and spinning reserve in the system, where CR1 is 5% of hydro generation + 7% of other conventional generation (excluding intermittent generation) + 10% of intermittent generation (wind power, solar power, etc. ), and CR2 is the power loss due to the outage of the largest generating unit at each hour [32].…”
Section: Constraintsmentioning
confidence: 99%
“…A number of studies have been carried out to incorporate IBDR in UC models or economic dispatch models [22][23][24][25][26]. In terms of effects, IBDR consists of load curtailment and load shifting [28]. The former effect can be treated as avoidable load.…”
Section: Introduction To Ibdr and Pbdrmentioning
confidence: 99%
“…Chance-constrained programming provides us a useful tools for modelling fuzzy decision systems [26][27][28][29][30]. The basic idea of chance-constrained programming of fuzzy maximum flow problem in hyper-networks setting is to optimize the flow value of hyper-network with some confidence level subject to certain chance constraints.…”
Section: Consider a Directed Flow Hyper-network H= ( )mentioning
confidence: 99%
“…However, some literatures demonstrate that, the main determinants of electricity demand in China are the proportion of income and secondary industry, and the impact of electricity price on power demand is not significant (Rong Fan, 2012) [4]. But the impact of new energy [5,6] and new energy products [7] on power demand is increasing. This paper will take Jilin Province as an example to analyze the influence factors of power demand under the background of energy conservation and emission reduction and economic new normal.…”
Section: Introductionmentioning
confidence: 99%