“…In the example above, with = 100 (the typical value employed in the literature, see Pastor (2011) and Pastor et al (2012)), the ideal distribution of workloads is = (10,8,8,7,7), and the ordered workloads for the first design are 10, 10, 9, 6, and 5. Therefore, value for the first design is:…”