2010 5th International Conference on System of Systems Engineering 2010
DOI: 10.1109/sysose.2010.5544000
|View full text |Cite
|
Sign up to set email alerts
|

A holonic shop floor workforce allocation system

Abstract: Productivity in labour-intensive manufacturing shopfloors is highly influenced by availability and conditions of skilled workers. As operations intensify, the need for the right people at the right time performing the right job becomes increasingly important in order to respond rapidly to any disturbances caused by changing customer demands or other factors in the manufacturing environment. In this paper, a flexible workforce allocation model is proposed and presented in the context of holonic manufacturing sy… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2011
2011
2017
2017

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 11 publications
0
1
0
Order By: Relevance
“…It also introduced features that stimulate the improvement of the satisfaction and utilisation level of flexible and skilled workers [13,14]. The augmentation in satisfaction level contributes to the development of relationships between companies and workers.…”
Section: A Workforce Allocationmentioning
confidence: 99%
“…It also introduced features that stimulate the improvement of the satisfaction and utilisation level of flexible and skilled workers [13,14]. The augmentation in satisfaction level contributes to the development of relationships between companies and workers.…”
Section: A Workforce Allocationmentioning
confidence: 99%