2016
DOI: 10.1007/s00603-016-0949-5
|View full text |Cite
|
Sign up to set email alerts
|

A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
20
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 51 publications
(20 citation statements)
references
References 18 publications
0
20
0
Order By: Relevance
“…Feng et al [208] comprehensively studied the evolution process of different types of rockbursts in deep tunnels using a large number of indoor and field tests data. Liu et al [209] proposed a microseismic method for early warning the occurrence probability of rockburst risk. Zhao et al [210] applied microseismic monitoring data to comparatively study the microseismic characteristics and rockburst risk of deep tunnel excavated by TBM-drilling and blasting method.…”
Section: Some Comprehensive Analysis Methods Based On Statistical Thementioning
confidence: 99%
“…Feng et al [208] comprehensively studied the evolution process of different types of rockbursts in deep tunnels using a large number of indoor and field tests data. Liu et al [209] proposed a microseismic method for early warning the occurrence probability of rockburst risk. Zhao et al [210] applied microseismic monitoring data to comparatively study the microseismic characteristics and rockburst risk of deep tunnel excavated by TBM-drilling and blasting method.…”
Section: Some Comprehensive Analysis Methods Based On Statistical Thementioning
confidence: 99%
“…Especially in hard rock, the wear of cutting tools of the excavating equipment is severe and the removal and reinstallation of cutting tools takes a long time, so mechanized excavation in hard rock is uneconomic and time-consuming. Although drilling and blasting is a traditional excavation method, it still plays an important role in tunnel excavation on account of its good applicability and economy [3][4][5]. At present, the mainstream blasting method is controlled blasting, which includes directional blasting, smooth blasting, splitting blasting, and millisecond blasting [6][7][8].…”
Section: Introductionmentioning
confidence: 99%
“…Meanwhile, excavation methods implemented in deep-buried tunnel excavation have considerable influence on the rockburst evolution process. Most deep-buried tunnels have been excavated by drill-and-blast (D&B) method resulting in large amounts of studies on the evolution mechanism and prevention of rockbursts associated with blasting excavation [38][39][40][41][42]. Nevertheless, TBM has always been the preferred method to construct the deep-buried tunnels owing to its incomparable advantages.…”
Section: Introductionmentioning
confidence: 99%