2010
DOI: 10.3233/ica-2010-0344
|View full text |Cite
|
Sign up to set email alerts
|

A multi-criteria optimization framework for industrial shop scheduling using fuzzy set theory

Abstract: The percentage of shop fabrication, including pipe spool fabrication, has been increasing on industrial construction projects in the past years. Industrial fabrication has a great impact on construction projects due to the fact that the productivity is higher in a controlled environment than in the field, and therefore time and cost of construction projects are reduced by making use of industrial fabrication. Effective planning and scheduling of industrial fabrication processes is important for the success of … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
20
0

Year Published

2010
2010
2020
2020

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 36 publications
(20 citation statements)
references
References 78 publications
(83 reference statements)
0
20
0
Order By: Relevance
“…When a defect is found, the quality auditor defines the degree of nonconformity relative to its “severity” and “frequency.” But this information and the final output (the quality performance index) are not precise. Fuzzy logic and fuzzy inference are well accepted in construction management research as a mathematical method that can effectively deal with the vagueness, impreciseness, and fuzziness of expert opinions (Chan et al, 2009; Rokni and Fayek, 2010). That is why fuzzy logic and fuzzy inference are used in this study to deal with the ill‐defined and complex human cognitive process involved in the linguistic assessment of nonconformity.…”
Section: Cqma Expertmentioning
confidence: 99%
“…When a defect is found, the quality auditor defines the degree of nonconformity relative to its “severity” and “frequency.” But this information and the final output (the quality performance index) are not precise. Fuzzy logic and fuzzy inference are well accepted in construction management research as a mathematical method that can effectively deal with the vagueness, impreciseness, and fuzziness of expert opinions (Chan et al, 2009; Rokni and Fayek, 2010). That is why fuzzy logic and fuzzy inference are used in this study to deal with the ill‐defined and complex human cognitive process involved in the linguistic assessment of nonconformity.…”
Section: Cqma Expertmentioning
confidence: 99%
“…This can be assumed for both mono-and multi-dimensional data. There are many works related to fuzzy theory as a tool for solving engineering problems (see, for example, [2,33]). The goal of this work is to protect released data using fuzzy set theory and to check the performance of this approach.…”
Section: Introductionmentioning
confidence: 99%
“…These facts are true (or false) only to some extent and computers may not process them. Fuzzy logic can be applied to extend computer capacities [19,21,25,32,35,[44][45][46] and provide them with mechanism to manage fuzzy spatiotemporal data.…”
Section: Introductionmentioning
confidence: 99%