A multiple objective transportation problem approach to dynamic truck dispatching in surface mines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
21
0
1

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
4

Relationship

1
8

Authors

Journals

citations
Cited by 63 publications
(26 citation statements)
references
References 20 publications
1
21
0
1
Order By: Relevance
“…Có nhiều nghiên cứu về việc tối ưu hóa đa mục tiêu chi phí vận chuyển và thời gian vận chuyển như [17][18][19]. Tuy nhiên, các nghiên cứu trước đây vẫn còn nhiều hạn chế như các giả định và môi trường làm việc không thực tế, thiếu ràng buộc chặt chẽ, thời gian tính toán quá dài [20], sau đó có những cải tiến khá hiệu quả trong cách tiếp cận mục tiêu và đưa ra các phương pháp mới hiệu quả hơn [21,22].…”
Section: Giới Thiệuunclassified
“…Có nhiều nghiên cứu về việc tối ưu hóa đa mục tiêu chi phí vận chuyển và thời gian vận chuyển như [17][18][19]. Tuy nhiên, các nghiên cứu trước đây vẫn còn nhiều hạn chế như các giả định và môi trường làm việc không thực tế, thiếu ràng buộc chặt chẽ, thời gian tính toán quá dài [20], sau đó có những cải tiến khá hiệu quả trong cách tiếp cận mục tiêu và đưa ra các phương pháp mới hiệu quả hơn [21,22].…”
Section: Giới Thiệuunclassified
“…location to other in mines either with larger trucks or optimum numbers of trucks (Choudhary, 2015) keeping in mind excavator productivity (Drygin et al, 2017), innovative mining equipment or optimised LHD machines (Pasch and Uludag, 2018;Bodziony et al, 2016;Tyulenev et al, 2017). Selection of dump machines (Bodziony et al, 2016), loader optimisation (Bodziony et al, 2016), equipment size evaluation and vehicle assignment are all have important role in an autonomous haulage system or road grade (Moradi Afrapoli et al, 2019;Torres et al, 2019;Yarmuch et al, 2019;Rio Tinto, 2014).…”
Section: Csr and Environmentmentioning
confidence: 99%
“…Until recently, several researchers applied stochastic simulation techniques to analyze optimal equipment combinations and design truck dispatch scenarios in both open-pit and underground mines [1,19,[21][22][23][24][25][26][27][28][29][30][31][32][33][34]. In these studies, truck cycle time data were statistically analyzed and a probability density function was selected using probability distribution models, such as Gaussian, triangular, Weibull, gamma, lognormal, exponential, Erlang, and uniform distribution models (Table 1).…”
Section: Introductionmentioning
confidence: 99%
“…The ore production, equipment utilization rate, and equipment downtime corresponding to the truck-shovel combination were analyzed probabilistically [25]. In addition, the ore production was predicted based on the confidence level, using iterative stochastic simulation [30], and the prediction sensitivity was analyzed by alternating the probability distribution models of the truck cycle time data [32]. However, little attention has been paid to analyze and use the probability distribution derived from a large amount of truck cycle time data for stochastic simulations.…”
Section: Introductionmentioning