2019
DOI: 10.1109/access.2019.2956059
|View full text |Cite
|
Sign up to set email alerts
|

A New Efficient Algorithm for Hazardous Material Transportation Problem via Lane Reservation

Abstract: Hazardous material transportation is well-known for its high potential risk. Minimizing the transportation risk is an important issue for hazardous material transportation. This paper focuses on a novel algorithm for the hazardous material transportation problem via lane reservation, whose goal is to obtain a best compromise between the impact on normal traffic due to lane reservation and the transportation risk. Firstly, a bi-objective integer programming model for the considered problem is formulated and tra… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(10 citation statements)
references
References 35 publications
0
10
0
Order By: Relevance
“…Chu et al [6] investigated the time-dependent lane reservation for hazmat and solved it via a cut-and-solve-based ε-constraint method. en a new cut-and-solve and cutting plane combined method is proposed to reduce the computational time [7].…”
Section: Lane Reservation Problemmentioning
confidence: 99%
See 3 more Smart Citations
“…Chu et al [6] investigated the time-dependent lane reservation for hazmat and solved it via a cut-and-solve-based ε-constraint method. en a new cut-and-solve and cutting plane combined method is proposed to reduce the computational time [7].…”
Section: Lane Reservation Problemmentioning
confidence: 99%
“…e objective function ( 6) is formulated to minimize the impact on normal traffic caused by the lane reservation strategy. Constraint (7) ensures the total risk should be reduced by α after lane reservation. Constraint (8) shows the 0-1 restriction on the upper decision variable.…”
Section: Hazmat Carriersmentioning
confidence: 99%
See 2 more Smart Citations
“…Other factors are due to construction and development work, such as poor road construction, poor drainage methods of torrential rains, and erosion as a result of floods [1]. Figure 1c,d illustrates some examples of these types of artificial problems [2,3].…”
Section: Introductionmentioning
confidence: 99%