2015 Annual IEEE India Conference (INDICON) 2015
DOI: 10.1109/indicon.2015.7443825
|View full text |Cite
|
Sign up to set email alerts
|

A new ZVS full-bridge DC-DC converter for battery charging with reduced losses over full-load range

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 11 publications
0
6
0
Order By: Relevance
“…No B2G operation discussed [17], [18], [20][21][22][23][24][25], [27], [29][30][31][32][33][34] Only Grid tied operation feasible [17][18][19][20][21][22][23][24][25][26][27], [30][31][32][33][34] Requires additional PFC circuit at front-end for functioning as EV charger [17][18][19], [22], [26][27][28], [31] Proposed topology…”
Section: Capable Of Standalone Operationmentioning
confidence: 99%
See 1 more Smart Citation
“…No B2G operation discussed [17], [18], [20][21][22][23][24][25], [27], [29][30][31][32][33][34] Only Grid tied operation feasible [17][18][19][20][21][22][23][24][25][26][27], [30][31][32][33][34] Requires additional PFC circuit at front-end for functioning as EV charger [17][18][19], [22], [26][27][28], [31] Proposed topology…”
Section: Capable Of Standalone Operationmentioning
confidence: 99%
“…Though the proposed topology achieves soft switching without any additional component, the topology involves significant control and design complexity. A zero‐voltage switching‐based isolated DC/DC FBC is proposed in [20]. However, the circuit needs an additional front‐end 1‐ɸ AC/DC PFC boost converter and electromagnetic interference filter for functioning as an EV charger.…”
Section: Introductionmentioning
confidence: 99%
“…Next, the range of duty cycle (Dmin and Dmax) is calculate to ensure the minimum and maximum duty cycle where the soft-switching occur. The minimum and maximum duty cycle can be expressed as follows: (14) (15) where the minimum duty cycle occurs when the input voltage in its maximum. By relating the inductance and capacitance snubbers with the resonant interval times where it can be suggested less than some fraction (0 < k < 1) of the switching period Ts.…”
Section: Design Guideline Of Ppssive Lossless Ssbber Circuitmentioning
confidence: 99%
“…This is due to the overlapping of current and voltage in semiconductor devices. Thus, in order to reduce the switching loss in converters circuit, soft-switching technique might be applied [12]- [15]. Passive lossless snubber is the effective technique for the softswitching implementation in order to tackle this issue due to simple circuit structure to be considered.…”
Section: Introductionmentioning
confidence: 99%
“…In other words, ZVS is still difficult to achieve with the hysteresis switch when the magnetic current is reduced [21]. In addition, the ZVS switching hysteresis can also be achieved using auxiliary circuits [22][23][24][25]. Under heavy loads, the ZVS condition is mainly determined by the energy stored in the leakage inductance; the auxiliary inductor does not produce a large current, and the conduction loss can be reduced.…”
Section: Introductionmentioning
confidence: 99%