2011
DOI: 10.1016/j.ijepes.2011.08.003
|View full text |Cite
|
Sign up to set email alerts
|

A novel approach to determine transmission reliability margin using parametric bootstrap technique

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
19
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 29 publications
(19 citation statements)
references
References 14 publications
0
19
0
Order By: Relevance
“…It is obvious that the look-ahead power transfer formulation in Equation (23) is similar to Equation (17). The y o and dy dx which are obtained by using Equation (21) and Equation (22), respectively are used in Equation (23) to determine the P look .…”
Section: Procedures Of Atc Evaluation Using Ralston's Methods Incorporamentioning
confidence: 99%
See 1 more Smart Citation
“…It is obvious that the look-ahead power transfer formulation in Equation (23) is similar to Equation (17). The y o and dy dx which are obtained by using Equation (21) and Equation (22), respectively are used in Equation (23) to determine the P look .…”
Section: Procedures Of Atc Evaluation Using Ralston's Methods Incorporamentioning
confidence: 99%
“…ATC is defined as the TTC less than the transmission reliability margin (TRM), less than the sum of existing transmission commitments (ETC) and capacity benefit margin (CBM) [2,16,17]. The TRM is the amount of transmission capability necessary to ensure that the interconnected system is secure under a reasonable range of uncertainties in system conditions.…”
Section: Atc Problem Definitionmentioning
confidence: 99%
“…A straightforward solution is constructing new transmission lines, but this faces a series of problems, such as large investments and environmental restrictions [1][2][3][4][5][6]. For example, establishing a new transmission line in Alberta is not only a political, but also a controversial problem [7].…”
Section: Introductionmentioning
confidence: 99%
“…In addition, societal and environmental concerns often cause lengthy approval processes for new constructions and/or upgrades. Alternative solutions concentrate on a better utilization of existing transmission lines through improved methods of thermal rating [1,2], or on identification of maximum loadability limits [3][4][5][6][7].…”
Section: Introductionmentioning
confidence: 99%