2003
DOI: 10.1016/s0167-8191(03)00016-4
|View full text |Cite
|
Sign up to set email alerts
|

A parallel implementation of an asynchronous team to the point-to-point connection problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2008
2008
2017
2017

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 12 publications
(3 citation statements)
references
References 8 publications
0
3
0
Order By: Relevance
“…Parallel processing has been widely used in combinatorial and continuous optimization [5,25,29,35] with the aim of improving the efficiency of the corresponding algorithms. When metaheuristics are considered, the goals are richer [7].…”
Section: Parallel Ls Proceduresmentioning
confidence: 99%
“…Parallel processing has been widely used in combinatorial and continuous optimization [5,25,29,35] with the aim of improving the efficiency of the corresponding algorithms. When metaheuristics are considered, the goals are richer [7].…”
Section: Parallel Ls Proceduresmentioning
confidence: 99%
“…Some implementations of A-Team were based on universal tools like Matlab [32]. Some other were written using algorithmic languages like, for example the parallel A-Team of [9] written in C and run under PVM operating system.…”
Section: Introductionmentioning
confidence: 99%
“…Some implementations of A-Team were based on universal tools like Matlab [16]. Some other were written using algorithmic languages like, for example the parallel A-Team of [5] written in C and run under PVM operating system.…”
Section: Introductionmentioning
confidence: 99%