A Qualitative Analysis of Public Private Partnership (PPP) Project Contracts in the Roads Sector. A Contextual Elucidation of Uganda National Roads Authority (UNRA)

Abstract: Public Private Partnership Projects continue to gain momentum across the world. Governments in developing countries now find PPP projects as an alternative to conventional financing and providing public infrastructure. Guided by the principal agency theory, this study examines different types of PPP Project contracts in the roads sector with specific focus on the Uganda National Roads Authority (UNRA). Contracting out of projects in the roads sector has led to increased costs of road construction in Uganda. Th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 29 publications
0
3
0
Order By: Relevance
“…Similarly, Stutely (2014) recommend a minimum sample of 30 for statistical analyses (Saunders et al, 2019). Therefore, a sample of 130 respondents was above the recommended minimum sample size and because the PPP model is relatively new in Uganda and only a few experts could be considered for this study (Kisitu, 2018;Mugarura, 2019;Nduhura, 2019;Nuwagaba, 2019;Twinomuhwezi, 2018). Additionally, these respondents were involved or had experience in PPPs which meant that the validity of the data can be reasonably inferred which is in line with Patton's (2015) argument that the purposive samples should be judged based on the rationale of the study.…”
Section: Methodsmentioning
confidence: 99%
“…Similarly, Stutely (2014) recommend a minimum sample of 30 for statistical analyses (Saunders et al, 2019). Therefore, a sample of 130 respondents was above the recommended minimum sample size and because the PPP model is relatively new in Uganda and only a few experts could be considered for this study (Kisitu, 2018;Mugarura, 2019;Nduhura, 2019;Nuwagaba, 2019;Twinomuhwezi, 2018). Additionally, these respondents were involved or had experience in PPPs which meant that the validity of the data can be reasonably inferred which is in line with Patton's (2015) argument that the purposive samples should be judged based on the rationale of the study.…”
Section: Methodsmentioning
confidence: 99%
“…Despite the enactment of the PPP Act in 2015, Uganda's road sector has not experienced significant growth in PPP adoption, as observed by Ndandiko (2018). While progress has been made, projects like the Kampala-Jinja highway have experienced short comings, including institutional capacity issues within the PPP framework (Nuwagaba, 2020).…”
Section: Introductionmentioning
confidence: 99%
“…Previous studies have highlighted how MCSs vary according to the structure of organizations (Vosselman and van der Meer‐Kooistra, 2006a, 2006b), other contextual and institutional variables (Damayanthi and Gooneratne, 2017; Speklé, 2001), as well as the PPP phases (Appuhami and Perera, 2016). MCS are influenced by the programmability of the task and activities, by the measurability of the output (Nuwagaba and Molokwane, 2020), and by the ability to program activities and define optimal contractual obligations (Speklé, 2001). This means that the specificities of PPPs can influence the type of MCS implemented.…”
Section: Introductionmentioning
confidence: 99%