A Rational Approach to Multilateral Project Planning

Abstract: In the past, junction construction technology has driven the design of multilateral wells. This practice has led to technical successes that may or may not have met all of the operator's desired well objectives. These projects have often been regarded as less than successful from an economic point of view. This regard is partly due to the way that junction construction has been viewed. Junctions are presently classified by looking at the technical differences in how they are constructed, such as TAML levels (T… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2004
2004
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…The key, then, is to promote those multilateral projects with the maximum added value and sticking with them through the learning phase to the point of reaping the greatest economic returns. 11 To date ConocoPhillips XIJIANG have already completed 18 multilaterals, including 1 each TAML Level 1, 1 each TAML Level 3, 15 each TAML Level 4 (10 of the 15 TAML Level 4 are constructed using only a single hollow whipstock system that this paper is based on. See Table 1.)…”
Section: Results and Conclusionmentioning
confidence: 99%
“…The key, then, is to promote those multilateral projects with the maximum added value and sticking with them through the learning phase to the point of reaping the greatest economic returns. 11 To date ConocoPhillips XIJIANG have already completed 18 multilaterals, including 1 each TAML Level 1, 1 each TAML Level 3, 15 each TAML Level 4 (10 of the 15 TAML Level 4 are constructed using only a single hollow whipstock system that this paper is based on. See Table 1.)…”
Section: Results and Conclusionmentioning
confidence: 99%
“…Had, by chance, the first two wells to penetrate these zones been spaced further apart, and thereby initially identifying a larger oil volume, the 65-1 sand might have been identified as a horizontal target earlier than what actually occurred. It was not until the KPWD-29 penetrated these zones on February 1, 2006 and defined the northern extent of the oil pay (see Figures 2,3 and 4) that it became clear that both zones were candidates for production via open-hole laterals, rather than just the 69-1 sand alone. Two weeks later the KPWD-13 delineated the southern extent of the oil pay.…”
Section: Horizontal Target Discovery and Characteristicsmentioning
confidence: 99%