A Review of the Low-Voltage Ride-Through Capability of Wind Power Generators

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
17
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 26 publications
(17 citation statements)
references
References 16 publications
0
17
0
Order By: Relevance
“…The FRT is usually provided by the wind turbines, since they have fast response times and can easily recover after a fault event by releasing energy back to the grid [52]. A review of low-voltage FRT strategies for various types of wind turbines is presented in [77][78][79]. During the last years, where the DG penetration has increased significantly, the grid operators demand FRT responses also from converter-interfaced DRES, like PVs.…”
Section: Frt Capability and Fault-clearingmentioning
confidence: 99%
“…The FRT is usually provided by the wind turbines, since they have fast response times and can easily recover after a fault event by releasing energy back to the grid [52]. A review of low-voltage FRT strategies for various types of wind turbines is presented in [77][78][79]. During the last years, where the DG penetration has increased significantly, the grid operators demand FRT responses also from converter-interfaced DRES, like PVs.…”
Section: Frt Capability and Fault-clearingmentioning
confidence: 99%
“…Literature [18][19][20][21][22] studied the low voltage ride-through (LVRT) requirements for the DFIG system studies. According to the grid code of China (GB/T 19963-2011) implemented in 2012, under the 20% voltage drop at the point of common coupling (PCC), the wind turbine must be grid connected for 625 ms and must have certain dynamic reactive power support capabilities.…”
Section: Figure 1 Schematic Diagram Of the Dfig Systemmentioning
confidence: 99%
“…(1) V ds = R s I ds − e qs + d ds ∕ dt By substituting the stator and rotor flux linkages in the d-q reference frame, thus the electromagnetic torque generated by DFIG can be expressed in (11) or (12) as follows:…”
Section: Dfig Model and Control Strategymentioning
confidence: 99%
“…Therefore, the power plant system may be failed due to cascaded tripping of wind turbine generators. To prevent power system failure, the wind turbine generators must be driven by the LVRT requirements [12]. Moreover, the wind turbine generators require a protection technique that usually adopted in order to improve and achieve LVRT requirements.…”
Section: Introductionmentioning
confidence: 99%