A Robust Reserve Scheduling Method Considering Wind Turbine Generator’s De-loading Control

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 12 publications
0
2
0
Order By: Relevance
“…Therefore, the current security correction problem of system with UPFC still needs to adopt the model-based optimization method [13][14][15], that is, to use the mathematical analysis method to solve the optimization model and obtain corresponding adjustment measures. It has been established in [16] that a security correction model with the minimum adjustment amount and uses the distributed robust optimization method to handle the power system security correction control problem with the uncertainty of wind power output; It has also been revealed in [17] that an optimization model considering the series compensator with the minimum load removal as the objective function. But when applied to the actual large power grid, the increase of optimization variables will significantly decrease the optimization efficiency.…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, the current security correction problem of system with UPFC still needs to adopt the model-based optimization method [13][14][15], that is, to use the mathematical analysis method to solve the optimization model and obtain corresponding adjustment measures. It has been established in [16] that a security correction model with the minimum adjustment amount and uses the distributed robust optimization method to handle the power system security correction control problem with the uncertainty of wind power output; It has also been revealed in [17] that an optimization model considering the series compensator with the minimum load removal as the objective function. But when applied to the actual large power grid, the increase of optimization variables will significantly decrease the optimization efficiency.…”
Section: Introductionmentioning
confidence: 99%
“…De-loading operation can be achieved by shifting the operating point below the MPP. Thus, converting a part of the available power from the wind to kinetic energy and storing it in the rotor [6], [7]. In this case, wind turbines can increase their output power following any frequency disturbance by converting the additional stored kinetic energy, whether partially or entirely to active power and sending it to the grid.…”
Section: Introductionmentioning
confidence: 99%