2021
DOI: 10.3390/app11115078
|View full text |Cite
|
Sign up to set email alerts
|

A Scheduling Algorithm for Multi-Workshop Production Based on BOM and Process Route

Abstract: For the scheduling problem of complex products in multi-workshop production, this paper studied the BOM (Bill of Materials) structure of complex products and the characteristics of the process route and developed the construction method of a multi-level process network diagram. Based on this, a comprehensive mathematical model for scheduling on multi-workshop production was proposed. An improved particle swarm algorithm (PSO) was proposed to solve the problem. By constructing the network subgraph, the invalid … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 28 publications
0
1
0
Order By: Relevance
“…Considering workshop process and production scheduling, literature [10] based on the dependence of the production planning, and scheduling problem of continuous production line on timing, a repair and optimization solution is proposed to solve the problem of energy efficiency in the production process. For the scheduling problem of complex products in multiworkshop production, literature [11] studies the characteristics of BOM structure and process route of complex products. Based on the construction of multilevel process network diagram, an improved particle swarm optimization algorithm is used to ensure the effectiveness of the algorithm search path.…”
Section: Introductionmentioning
confidence: 99%
“…Considering workshop process and production scheduling, literature [10] based on the dependence of the production planning, and scheduling problem of continuous production line on timing, a repair and optimization solution is proposed to solve the problem of energy efficiency in the production process. For the scheduling problem of complex products in multiworkshop production, literature [11] studies the characteristics of BOM structure and process route of complex products. Based on the construction of multilevel process network diagram, an improved particle swarm optimization algorithm is used to ensure the effectiveness of the algorithm search path.…”
Section: Introductionmentioning
confidence: 99%