A Summary of the Recent Work at NTNU on Marine Operations Related to Installation of Offshore Wind Turbines

Abstract: In this paper, a summary of the recent work at NTNU on the installation of offshore wind turbines using jack-up and floating vessels will be reported. The wind turbine components considered here are the monopile foundations and the blades. The detailed discussions are given to the crane operations for installing wind turbine blades as well as novel installation methods for pre-assembled rotor-nacelle-tower. It includes numerical modelling and analysis for global dynamic responses of the installation system (in… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 15 publications
0
1
0
Order By: Relevance
“…The Hywind Tampen project, with a capacity of 88 MW, attained the Financial Investment Decision in 2019 and is currently in the pre-construction phase. The objective of the project is to achieve a cost reduction of 40% compared to Hywind Scotland, which served as the initial demonstration of the spar-buoy technology [10]. Nevertheless, the current installation method still involves assembling the turbines in a sheltered location and then towing each complete assembly individually to the installation site for final commissioning.…”
mentioning
confidence: 99%
“…The Hywind Tampen project, with a capacity of 88 MW, attained the Financial Investment Decision in 2019 and is currently in the pre-construction phase. The objective of the project is to achieve a cost reduction of 40% compared to Hywind Scotland, which served as the initial demonstration of the spar-buoy technology [10]. Nevertheless, the current installation method still involves assembling the turbines in a sheltered location and then towing each complete assembly individually to the installation site for final commissioning.…”
mentioning
confidence: 99%